IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0333 # 03 Y:1991 03 1991 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,653 $1,800 Implemented
OK0333 # 04 Y:1991 04 1991 USE OPTIMUM THICKNESS INSULATION $4,914 $9,600 Implemented
OK0333 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $0 Implemented
OK0333 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $117 $65 Implemented
OK0333 # 07 Y:1991 07 1991 INSULATE FEEDWATER TANK $41 $66 Implemented
OK0333 # 08 Y:1991 08 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $197 $410 Implemented
OK0333 # 09 Y:1991 09 1991 INSTALL TIMERS AND/OR THERMOSTATS $574 $1,050 Implemented
OR0106 # 01 Y:1991 01 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,459 $0 Implemented
OR0106 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $13,315 $0 Implemented
OR0106 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,030 $20,000 Implemented
OR0106 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,238 $2,448 Implemented
OR0106 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,897 $40,925 Implemented
RU0106 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $798 $0 Implemented
RU0106 # 02 Y:1991 02 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $648 $0 Implemented
RU0106 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $507 $800 Implemented
RU0106 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $645 $500 Implemented
RU0106 # 05 Y:1991 05 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,924 $0 Implemented
RU0106 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,160 $218 Implemented
MO0016 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $45 Implemented
MO0016 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $440 $1,095 Implemented
MO0016 # 03 Y:1991 03 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $383 $1,145 Implemented
MO0016 # 04 Y:1991 04 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $138 $150 Implemented
MO0016 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $41 $0 Implemented
MO0016 # 06 Y:1991 06 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $18 $3 Implemented
MO0016 # 07 Y:1991 07 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $10 $210 Implemented