IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0147 # 08 Y:1992 08 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $690 $125 Implemented
AM0148 # 01 Y:1992 01 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,800 $400 Implemented
AM0148 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $1,275 $1,275 Implemented
AM0148 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $420 Implemented
AM0148 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $354 $350 Implemented
AM0148 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Implemented
AM0148 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $140 $200 Not Implemented
AS0050 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,252 $38,963 Not Implemented
AS0050 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,356 $0 Implemented
AS0050 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,689 $13,875 Not Implemented
AS0050 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,142 $0 Implemented
AS0050 # 05 Y:1992 05 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,019 $1,000 Not Implemented
AS0050 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $3,077 $0 Not Implemented
AS0050 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $200 Implemented
AS0050 # 08 Y:1992 08 1992 INSULATE BARE EQUIPMENT $2,929 $1,885 Not Implemented
AS0050 # 09 Y:1992 09 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $263 $900 Not Implemented
AS0050 # 10 Y:1992 10 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $514 $5,315 Implemented
AS0050 # 11 Y:1992 11 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $2,410 Implemented
AS0050 # 12 Y:1992 12 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,148 $5,040 Implemented
AS0050 # 13 Y:1992 13 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $460 $70 Implemented
AS0050 # 14 Y:1992 14 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $104,246 $350,000 Not Implemented
AS0050 # 15 Y:1992 15 1992 RECOVER AND REUSE COOLING WATER $6,188 $4,000 Not Implemented
KU0365 # 01 Y:1992 01 1992 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $13,442 $0 Not Implemented
KU0365 # 02 Y:1992 02 1992 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,266 $31,766 Implemented
KU0365 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,768 $887 Implemented