IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0110 # 04 Y:2001 04 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,316 $1,000 Not Implemented
LL0110 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,810 $4,752 Not Implemented
LL0110 # 06 Y:2001 06 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $333 $0 Not Implemented
TA0007 # 01 Y:2001 01 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $8,063 $1,741 Implemented
TA0007 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $5,666 $2,886 Implemented
TA0007 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,918 $0 Implemented
TA0007 # 04 Y:2001 04 2001 USE SYNTHETIC LUBRICANT $2,175 $0 Not Implemented
TA0007 # 05 Y:2001 05 2001 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $2,036 $0 Implemented
TA0007 # 06 Y:2001 06 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $999 $46 Implemented
TA0007 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $303 $313 Implemented
TA0007 # 08 Y:2001 08 2001 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $287 $23 Not Implemented
UD0619 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $124,956 $0 Implemented
UD0619 # 02 Y:2001 02 2001 REPROCESS SPENT OILS ON SITE FOR RE-USE $18,573 $6,262 Implemented
UD0619 # 03 Y:2001 03 2001 METER WASTE WATER $14,438 $500 Implemented
UD0619 # 04 Y:2001 04 2001 RECOVER AND REUSE WASTE MATERIAL $5,700 $0 Not Implemented
UD0619 # 05 Y:2001 05 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $6,322 $940 Implemented
UD0619 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,846 $5,628 Implemented
UD0619 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,873 $2,400 Implemented
UD0619 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $2,256 Not Implemented
SD0279 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,073 $1,400 Implemented
SD0279 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,923 $3,500 Not Implemented
SD0279 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $155,224 $451,000 Not Implemented
SD0279 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $46,505 $45,000 Not Implemented
SD0279 # 05 Y:2001 05 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,287 $3,400 Not Implemented
SD0279 # 06 Y:2001 06 2001 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,667 $1,000 Implemented