Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0400 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,150 | $2,750 | Implemented |
AM0400 # 04 Y:2001 | 04 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,040 | $960 | Implemented |
AM0400 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $900 | $200 | Implemented |
TA0007 # 01 Y:2001 | 01 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,063 | $1,741 | Implemented |
TA0007 # 02 Y:2001 | 02 | 2001 | INSULATE BARE EQUIPMENT | $5,666 | $2,886 | Implemented |
TA0007 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,918 | $0 | Implemented |
TA0007 # 04 Y:2001 | 04 | 2001 | USE SYNTHETIC LUBRICANT | $2,175 | $0 | Not Implemented |
TA0007 # 05 Y:2001 | 05 | 2001 | SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON | $2,036 | $0 | Implemented |
TA0007 # 06 Y:2001 | 06 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $999 | $46 | Implemented |
TA0007 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $303 | $313 | Implemented |
TA0007 # 08 Y:2001 | 08 | 2001 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $287 | $23 | Not Implemented |
IC0007 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,050 | $2,125 | Implemented |
IC0007 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,195 | $25,250 | Not Implemented |
IC0007 # 03 Y:2001 | 03 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,066 | $195 | Implemented |
IC0007 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,387 | $18,965 | Not Implemented |
IC0007 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $94 | $372 | Not Implemented |
IC0007 # 06 Y:2001 | 06 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $6,200 | $1,800 | Not Implemented |
IC0007 # 07 Y:2001 | 07 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $9,100 | $35,000 | Not Implemented |
IC0007 # 08 Y:2001 | 08 | 2001 | CLEAR AND RENT EXISTING SPACE | $36,000 | $4,400 | Implemented |
SD0279 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,073 | $1,400 | Implemented |
SD0279 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,923 | $3,500 | Not Implemented |
SD0279 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $155,224 | $451,000 | Not Implemented |
SD0279 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $46,505 | $45,000 | Not Implemented |
SD0279 # 05 Y:2001 | 05 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,287 | $3,400 | Not Implemented |
SD0279 # 06 Y:2001 | 06 | 2001 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,667 | $1,000 | Implemented |