IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0775 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $82 $0 Implemented
UW0010 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,108 $4,160 Implemented
UW0010 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,398 $75,533 Not Implemented
UW0010 # 03 Y:2008 03 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,340 $3,000 Not Implemented
SF0353 # 01 Y:2008 01 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,294 $2,185 Not Implemented
SF0353 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,063 $1,355 Not Implemented
SF0353 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $2,458 $2,016 Implemented
SF0353 # 04 Y:2008 04 2008 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $45,262 $60,000 Not Implemented
SF0353 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,324 $2,426 Not Implemented
SF0353 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $9,259 $18,610 Not Implemented
SF0353 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $853 $1,675 Not Implemented
SF0353 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89,877 $118,644 Implemented
SF0353 # 09 Y:2008 09 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,960 $24,943 Implemented
SF0353 # 10 Y:2008 10 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,273 $11,479 Not Implemented
SF0353 # 11 Y:2008 11 2008 INSULATE BARE EQUIPMENT $2,256 $22,235 Implemented
UA0014 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,796 $0 Implemented
UA0014 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,143 $1,040 Implemented
UA0014 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $2,493 $2,877 Not Implemented
UA0014 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $5,800 $14,850 Not Implemented
UA0014 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,454 $591 Implemented
UA0014 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,934 $13,520 Not Implemented
UA0014 # 07 Y:2008 07 2008 SHUT OFF PILOTS IN STANDBY EQUIPMENT $457 $72 Implemented
UA0014 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,943 $1,164 Not Implemented
UA0014 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $2,288 $770 Not Implemented
UA0014 # 10 Y:2008 10 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $644 $700 Not Implemented