Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0304 # 02 Y:2006 | 02 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,428 | $1,000 | Not Implemented |
BD0304 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $330 | $0 | Not Implemented |
BD0304 # 04 Y:2006 | 04 | 2006 | AUTOMATE FINISHING PROCESS | $238,680 | $320,000 | Not Implemented |
BD0304 # 05 Y:2006 | 05 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $24,840 | $24,000 | Not Implemented |
BD0304 # 06 Y:2006 | 06 | 2006 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $17,742 | $13,293 | Not Implemented |
BD0304 # 07 Y:2006 | 07 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $11,248 | $15,050 | Not Implemented |
BD0304 # 08 Y:2006 | 08 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,235 | $4,000 | Not Implemented |
BD0304 # 09 Y:2006 | 09 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $495 | $1,210 | Not Implemented |
BD0304 # 10 Y:2006 | 10 | 2006 | USE PHOTOCELL CONTROLS | $365 | $575 | Not Implemented |
BD0304 # 11 Y:2006 | 11 | 2006 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $471 | $300 | Not Implemented |
SD0379 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $212,485 | $900,288 | Not Implemented |
SD0379 # 02 Y:2006 | 02 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $169,122 | $0 | Not Implemented |
SD0379 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $110,534 | $160,385 | Not Implemented |
SD0379 # 04 Y:2006 | 04 | 2006 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $82,170 | $150,000 | Not Implemented |
SD0379 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,140 | $18,110 | Not Implemented |
SD0379 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,974 | $220 | Implemented |
MI0126 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,617 | $16,000 | Implemented |
MI0126 # 02 Y:2006 | 02 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,323 | $1,020 | Implemented |
MI0126 # 03 Y:2006 | 03 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,331 | $212 | Implemented |
MI0126 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,497 | $1,750 | Implemented |
MI0126 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,474 | $0 | Implemented |
MI0126 # 06 Y:2006 | 06 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $42,242 | $140 | Implemented |
MS0292 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,743 | $34,278 | Implemented |
MS0292 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,311 | $46,268 | Implemented |
MS0292 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,836 | $21,282 | Implemented |