IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0216 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,054 $3,559 Implemented
TT0216 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $386 $1,530 Implemented
MZ0263 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,735 $2,278 Implemented
MZ0263 # 02 Y:2019 02 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,027 $7,760 Implemented
MZ0263 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $2,053 $2,760 Implemented
NC0627 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,799 $71,461 Implemented
AM0774 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $200,328 $100 Not Implemented
AM0774 # 02 Y:2019 02 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $180,556 $1,134,251 Not Implemented
AM0774 # 03 Y:2019 03 2019 ISOLATE HOT OR COLD EQUIPMENT $133,950 $353,500 Not Implemented
AM0774 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $48,197 $757,373 Not Implemented
AM0774 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $41,452 $72,710 Not Implemented
AM0774 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,150 $36,000 Not Implemented
AM0774 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,577 $17,085 Not Implemented
AM0774 # 08 Y:2019 08 2019 USE SYNTHETIC LUBRICANT $2,349 $1,600 Not Implemented
NC0627 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,085 $345 Implemented
NC0627 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $925 $100 Not Implemented
NC0627 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,232 $500 Implemented
NC0627 # 05 Y:2019 05 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,215 $0 Implemented
UA0206 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,997 $12,406 Not Implemented
UA0206 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $1,372 Implemented
UA0206 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,768 $500 Not Implemented
UA0206 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $66,257 $100,000 Not Implemented
UA0206 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $7,065 $8,101 Implemented
SD0575 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,276 $7,083 Not Implemented
SD0575 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,233 $600 Implemented