IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,500

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0519 # 04 Y:2016 04 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $45,119 $1,000 Implemented
WV0519 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,274 $33,606 Implemented
WV0519 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $9,710 $691 Implemented
WV0519 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,404 $4,258 Implemented
WV0519 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,974 $333 Implemented
WV0519 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,944 $155 Implemented
WV0519 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,228 $0 Implemented
WV0519 # 11 Y:2016 11 2016 INSULATE BARE EQUIPMENT $247 $439 Not Implemented
NC0558 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $28,923 $17,820 Not Implemented
NC0558 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,925 $300 Implemented
NC0558 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $16,078 $5,000 Implemented
NC0558 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,981 $1,000 Not Implemented
NC0558 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,947 $6,425 Implemented
NC0558 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $44 $120 Not Implemented
NC0558 # 07 Y:2015 07 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,599 $250,000 Not Implemented
NC0558 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,031 $227 Implemented
NC0558 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $296 $80 Implemented
NC0558 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $288 $372 Implemented
NC0558 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $145 $716 Implemented
NC0558 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $1,595 Implemented
NC0552 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,792,252 $500,000 Not Implemented
NC0552 # 02 Y:2015 02 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $174,643 $100,000 Not Implemented
NC0552 # 03 Y:2015 03 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $49,347 $200,000 Not Implemented
NC0552 # 04 Y:2015 04 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,541 $30,000 Not Implemented
NC0552 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,960 $6,000 Not Implemented