IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0244 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $448 $356 Implemented
SU0244 # 12 Y:2006 12 2006 OPTIMIZE PLANT POWER FACTOR $11,590 $30,856 Not Implemented
SU0244 # 13 Y:2006 13 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $1,187,734 $4,100,000 Not Implemented
TA0125 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,191 $155 Implemented
TA0125 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $894 $0 Implemented
TA0125 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $268,990 $0 Implemented
TA0125 # 04 Y:2006 04 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $421 $0 Implemented
UM0315 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $53,281 $1,800 Not Implemented
UM0315 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $36,263 $15,000 Not Implemented
UM0315 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $34,667 $8,066 Not Implemented
UM0315 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $32,300 $80,207 Not Implemented
UM0315 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,713 $40,991 Not Implemented
UM0315 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $1,369 $230 Not Implemented
UM0315 # 07 Y:2006 07 2006 ADD AREA LIGHTING SWITCHES $1,294 $1,100 Not Implemented
UM0315 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $526 $225 Implemented
UU0112 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $0 $0 Not Implemented
UU0112 # 02 Y:2006 02 2006 REPAIR OR REPLACE STEAM TRAPS $121,540 $8,720 Not Implemented
UU0112 # 03 Y:2006 03 2006 CLOSE OFF UNNEEDED STEAM LINES $140,530 $250,000 Not Implemented
UU0112 # 04 Y:2006 04 2006 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $69,680 $200,000 Not Implemented
UU0112 # 05 Y:2006 05 2006 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $65,810 $442,960 Not Implemented
UU0112 # 06 Y:2006 06 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,030 $0 Not Implemented
UM0314 # 01 Y:2006 01 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $62,424 $69,750 Not Implemented
UM0314 # 02 Y:2006 02 2006 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $30,865 $25,000 Not Implemented
UM0314 # 03 Y:2006 03 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12,963 $2,480 Implemented
UM0314 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,296 $7,000 Not Implemented