Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,184
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0126 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,221 | $938 | Not Implemented |
UM0126 # 03 Y:1998 | 03 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,053 | $5,250 | Implemented |
UM0126 # 04 Y:1998 | 04 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $24,729 | $250 | Not Implemented |
UM0126 # 05 Y:1998 | 05 | 1998 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $21,553 | $80,000 | Not Implemented |
UM0126 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $862 | $1,000 | Implemented |
UM0126 # 07 Y:1998 | 07 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,603 | $2,000 | Implemented |
UM0126 # 08 Y:1998 | 08 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,264 | $1,800 | Implemented |
UM0126 # 09 Y:1998 | 09 | 1998 | RECOVER AND REUSE COOLING WATER | $6,202 | $4,500 | Implemented |
UM0126 # 10 Y:1998 | 10 | 1998 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $200,000 | $0 | Implemented |
UM0126 # 11 Y:1998 | 11 | 1998 | CLEAR AND RENT EXISTING SPACE | $151,198 | $5,000 | Not Implemented |
ND0305 # 01 Y:1998 | 01 | 1998 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,973 | $22,500 | Not Implemented |
ND0305 # 02 Y:1998 | 02 | 1998 | OPTIMIZE PLANT POWER FACTOR | $19,450 | $11,886 | Not Implemented |
ND0305 # 03 Y:1998 | 03 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,120 | $85,000 | Implemented |
ND0305 # 04 Y:1998 | 04 | 1998 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $13,776 | $4,000 | Not Implemented |
ND0305 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,160 | $49,023 | Not Implemented |
ND0305 # 06 Y:1998 | 06 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,626 | $9,836 | Not Implemented |
ND0305 # 07 Y:1998 | 07 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,306 | $3,240 | Not Implemented |
ND0305 # 08 Y:1998 | 08 | 1998 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $3,722 | $10,000 | Not Implemented |
ND0305 # 09 Y:1998 | 09 | 1998 | OPTIMIZE PLANT POWER FACTOR | $5,272 | $1,250 | Not Implemented |
ND0305 # 10 Y:1998 | 10 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,611 | $15,801 | Not Implemented |
ND0305 # 11 Y:1998 | 11 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,422 | $340 | Implemented |
ND0305 # 12 Y:1998 | 12 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,101 | $5,400 | Not Implemented |
ND0305 # 13 Y:1998 | 13 | 1998 | CONVERT TO AQUEOUS CLEANING SYSTEM | $793 | $150 | Not Implemented |
ND0305 # 14 Y:1998 | 14 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,100 | $1,180 | Implemented |
ND0305 # 15 Y:1998 | 15 | 1998 | UPGRADE OBSOLETE EQUIPMENT | $670 | $1,750 | Not Implemented |