Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0363 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $971 | $2,171 | Not Implemented |
IA0363 # 06 Y:2005 | 06 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $20,328 | $0 | Implemented |
IA0363 # 07 Y:2005 | 07 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,742 | $95 | Not Implemented |
IA0363 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $859 | $1,617 | Not Implemented |
OR0482 # 01 Y:2005 | 01 | 2005 | MODIFY CURRENT INCENTIVE PROGRAM | $220,500 | $33,360 | Not Implemented |
OR0482 # 02 Y:2005 | 02 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $60,800 | $101,000 | Not Implemented |
OR0482 # 03 Y:2005 | 03 | 2005 | COMBINE UTILITY METERS | $1,500 | $4,000 | Not Implemented |
OR0482 # 04 Y:2005 | 04 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,526 | $0 | Implemented |
AM0489 # 01 Y:2005 | 01 | 2005 | MODIFY CURRENT INCENTIVE PROGRAM | $6,000 | $6,000 | Not Implemented |
AM0489 # 02 Y:2005 | 02 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,140 | $0 | Implemented |
AM0489 # 03 Y:2005 | 03 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,500 | $5,200 | Implemented |
AM0489 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,760 | $1,000 | Implemented |
AM0489 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,700 | $500 | Not Implemented |
BD0285 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,090 | $2,695 | Implemented |
BD0285 # 02 Y:2005 | 02 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,976 | $4,080 | Implemented |
BD0285 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,695 | $0 | Implemented |
BD0285 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $995 | $675 | Not Implemented |
BD0285 # 05 Y:2005 | 05 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $487 | $900 | Implemented |
BD0285 # 06 Y:2005 | 06 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $488 | $0 | Implemented |
BD0285 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $370 | $360 | Implemented |
BD0285 # 08 Y:2005 | 08 | 2005 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $11,600 | $480 | Implemented |
BD0285 # 09 Y:2005 | 09 | 2005 | MINIMIZE WATER USAGE | $3,135 | $1,320 | Not Implemented |
BD0285 # 10 Y:2005 | 10 | 2005 | CHANGE OPERATING CONDITIONS | $2,898 | $2,500 | Not Implemented |
LM0097 # 01 Y:2005 | 01 | 2005 | DEVELOP STANDARD OPERATING PROCEDURES | $48,120 | $4,921 | Implemented |
LM0097 # 02 Y:2005 | 02 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $10,000 | $6,000 | Not Implemented |