IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0363 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $2,171 Not Implemented
IA0363 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $20,328 $0 Implemented
IA0363 # 07 Y:2005 07 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,742 $95 Not Implemented
IA0363 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $859 $1,617 Not Implemented
OR0482 # 01 Y:2005 01 2005 MODIFY CURRENT INCENTIVE PROGRAM $220,500 $33,360 Not Implemented
OR0482 # 02 Y:2005 02 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $60,800 $101,000 Not Implemented
OR0482 # 03 Y:2005 03 2005 COMBINE UTILITY METERS $1,500 $4,000 Not Implemented
OR0482 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,526 $0 Implemented
AM0489 # 01 Y:2005 01 2005 MODIFY CURRENT INCENTIVE PROGRAM $6,000 $6,000 Not Implemented
AM0489 # 02 Y:2005 02 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,140 $0 Implemented
AM0489 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,500 $5,200 Implemented
AM0489 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $1,000 Implemented
AM0489 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,700 $500 Not Implemented
BD0285 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,090 $2,695 Implemented
BD0285 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,976 $4,080 Implemented
BD0285 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,695 $0 Implemented
BD0285 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $995 $675 Not Implemented
BD0285 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $900 Implemented
BD0285 # 06 Y:2005 06 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $488 $0 Implemented
BD0285 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $370 $360 Implemented
BD0285 # 08 Y:2005 08 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $11,600 $480 Implemented
BD0285 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $3,135 $1,320 Not Implemented
BD0285 # 10 Y:2005 10 2005 CHANGE OPERATING CONDITIONS $2,898 $2,500 Not Implemented
LM0097 # 01 Y:2005 01 2005 DEVELOP STANDARD OPERATING PROCEDURES $48,120 $4,921 Implemented
LM0097 # 02 Y:2005 02 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,000 $6,000 Not Implemented