IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50,330

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2413 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,186 $5,713 Implemented
UW2413 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $53 $229 Implemented
UW2413 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,582 $7,250 Implemented
UU0259 # 01 Y:2024 01 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $3,866,540 $17,885,484 n/a
UU0259 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $221,450 $2,473,450 n/a
UU0259 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $205,038 $1,865,253 n/a
UU0259 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,165 $110,030 n/a
UU0259 # 05 Y:2024 05 2024 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $53,643 $33,000 n/a
UU0259 # 06 Y:2024 06 2024 INSTALL COMMON HEADER ON COMPRESSORS $3,995 $9,200 n/a
SF0626 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,235 $0 n/a
SF0626 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $3,992 $0 n/a
SF0626 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $425 $140 n/a
SF0626 # 04 Y:2024 04 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,979 $27,525 n/a
SF0626 # 05 Y:2024 05 2024 AVOID FROST FORMATION ON EVAPORATORS $10,643 $13,568 n/a
SF0626 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,227 $12,256 n/a
SF0626 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,248 $52,290 n/a
SF0626 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $166 $750 n/a
SF0626 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $81,243 $249,045 n/a
UF0622 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $41,219 $322,608 Not Implemented
UF0622 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $43,371 $52,879 Not Implemented
UF0622 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $13,853 $3,888 Implemented
UF0622 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,345 $12,420 Implemented
UF0622 # 05 Y:2024 05 2024 UPGRADE OBSOLETE EQUIPMENT $10,345 $46,500 Not Implemented
UF0622 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,789 $25,360 Not Implemented
UF0622 # 07 Y:2024 07 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,875 $6,148 Implemented