IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,612

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0288 # 13 Y:2005 13 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,651 $1,250 Not Implemented
BD0284 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,372 $800 Implemented
BD0284 # 02 Y:2005 02 2005 USE SYNTHETIC LUBRICANT $7,827 $2,200 Not Implemented
BD0284 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,583 $18,820 Implemented
BD0284 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,801 $1,464 Implemented
BD0284 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $360 Implemented
BD0284 # 06 Y:2005 06 2005 USE RADIANT HEATER FOR SPOT HEATING $7,427 $4,800 Implemented
BD0284 # 07 Y:2005 07 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $911 $0 Not Implemented
BD0284 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $967 $900 Implemented
BD0284 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $3,546 $2,240 Implemented
IC0099 # 01 Y:2005 01 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,719 $35,000 Not Implemented
IC0099 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,085 $66,591 Not Implemented
IC0099 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $246 $0 Implemented
IC0099 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,577 $1,200 Implemented
IC0099 # 05 Y:2005 05 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $6,852 $1,520 Implemented
IC0099 # 06 Y:2005 06 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $671 $48 Not Implemented
IC0099 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $92 $364 Not Implemented
IC0099 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $531 $1,121 Not Implemented
BD0283 # 01 Y:2005 01 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,694 $3,003 Implemented
BD0283 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,780 $602 Not Implemented
BD0283 # 03 Y:2005 03 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,828 $2 Implemented
BD0283 # 04 Y:2005 04 2005 USE RADIANT HEATER FOR SPOT HEATING $2,160 $361 Not Implemented
BD0283 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,700 $851 Implemented
BD0283 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $1,499 $5 Not Implemented
BD0283 # 07 Y:2005 07 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,269 $400 Implemented