IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,184

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0305 # 16 Y:1998 16 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $501 $2,800 Implemented
ND0305 # 17 Y:1998 17 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $312 $50 Implemented
ND0305 # 18 Y:1998 18 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $128 $275 Implemented
ND0305 # 19 Y:1998 19 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $67 $20 Not Implemented
UM0125 # 01 Y:1998 01 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,144 $250 Implemented
UM0125 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $47,135 $3,000 Implemented
UM0125 # 03 Y:1998 03 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $89,497 $25,000 Implemented
UM0125 # 04 Y:1998 04 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $250,120 $1,500,000 Not Implemented
UM0125 # 05 Y:1998 05 1998 INSTALL BACK-UP EQUIPMENT $11,544 $24,180 Not Implemented
UM0120 # 01 Y:1998 01 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,335 $250 Not Implemented
UM0120 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,860 $1,000 Implemented
UM0120 # 03 Y:1998 03 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,029 $1,000 Implemented
UM0120 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,783 $100 Implemented
UM0120 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $962 $1,500 Not Implemented
UM0120 # 06 Y:1998 06 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $14,994 $5,000 Not Implemented
UM0120 # 07 Y:1998 07 1998 IMPROVE SPACE COMFORT CONDITIONING $1,440 $518 Implemented
UM0124 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,424 $1,183 Implemented
UM0124 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,856 $10,304 Implemented
UM0124 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $426 $1,000 Not Implemented
UM0124 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,583 $3,500 Not Implemented
UM0124 # 05 Y:1998 05 1998 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $17,113 $4,120 Not Implemented
UM0124 # 06 Y:1998 06 1998 ELIMINATE/REDUCE AN OPERATION $22,516 $9,600 Implemented
UM0124 # 07 Y:1998 07 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $158,133 $30,000 Implemented
UM0122 # 01 Y:1998 01 1998 INSTALL OCCUPANCY SENSORS $10,711 $6,800 Not Implemented
UM0122 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $1,000 Not Implemented