IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0361 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,000 $31,000 Implemented
UM0361 # 04 Y:2010 04 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,484 $1,200 Implemented
UM0361 # 05 Y:2010 05 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,810 $5,718 Not Implemented
UM0361 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,522 $600 Implemented
UM0361 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,227 $650 Implemented
UM0361 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $1,137 $5,520 Implemented
UM0361 # 09 Y:2010 09 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $396 $400 Implemented
UM0361 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $355 $750 Implemented
IA0447 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $745 $487 Not Implemented
IA0447 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,514 $13,439 Implemented
IA0447 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,599 $1,140 Implemented
IA0447 # 04 Y:2010 04 2010 REDUCE VENTILATION AIR $3,072 $2,000 Implemented
IA0447 # 05 Y:2010 05 2010 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $6,801 $42,100 Not Implemented
IA0447 # 06 Y:2010 06 2010 REPLACE BOILER $29,283 $53,900 Implemented
IA0447 # 07 Y:2010 07 2010 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $525 $5,000 Implemented
MS0349 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,903 $31,050 Implemented
MS0349 # 02 Y:2010 02 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,920 $140 Not Implemented
MS0349 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,685 $389 Implemented
MS0349 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $3,399 $671 Not Implemented
MA0656 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,238 $900 Implemented
MA0656 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,273 $19,075 Not Implemented
MA0656 # 03 Y:2010 03 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,578 $2,400 Not Implemented
MA0656 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $16,891 $15,755 Not Implemented
MA0656 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,718 $3,915 Implemented
MA0656 # 06 Y:2010 06 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,936 $68,200 Implemented