IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0860 # 04 Y:2012 04 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,863 $5,250 Implemented
UD0860 # 05 Y:2012 05 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $565 $900 Not Implemented
UD0858 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,297 $12,425 Not Implemented
UD0858 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,138 $3,850 Not Implemented
UD0858 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,006 $500 Implemented
UD0858 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,010 $1,000 Implemented
UD0858 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $399 $300 Not Implemented
UD0858 # 06 Y:2012 06 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $409 $360 Not Implemented
UD0859 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,512 $10,150 Not Implemented
UD0859 # 02 Y:2012 02 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $581 $600 Implemented
UD0859 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,313 $100 Not Implemented
UD0859 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,041 $2,000 Not Implemented
UD0859 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,953 $1,000 Implemented
UD0859 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $20,256 $6,033 Implemented
UD0859 # 07 Y:2012 07 2012 REDUCE EXCESS STEAM BLEEDING $20,148 $0 Implemented
UD0859 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,768 $2,000 Implemented
UD0859 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,869 $10,000 Not Implemented
UD0859 # 10 Y:2012 10 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $4,657 $5,000 Not Implemented
UD0857 # 01 Y:2012 01 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $4,781 $2,000 Not Implemented
UD0857 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,979 $11,880 Not Implemented
UD0857 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,696 $6,800 Not Implemented
UD0857 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,324 $15,150 Not Implemented
UD0857 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $834 $2,000 Not Implemented
UD0857 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $1,000 Not Implemented
UD0857 # 07 Y:2012 07 2012 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $7,051 $2,000 Not Implemented