Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0860 # 04 Y:2012 | 04 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,863 | $5,250 | Implemented |
UD0860 # 05 Y:2012 | 05 | 2012 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $565 | $900 | Not Implemented |
UD0858 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,297 | $12,425 | Not Implemented |
UD0858 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,138 | $3,850 | Not Implemented |
UD0858 # 03 Y:2012 | 03 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,006 | $500 | Implemented |
UD0858 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,010 | $1,000 | Implemented |
UD0858 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $399 | $300 | Not Implemented |
UD0858 # 06 Y:2012 | 06 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $409 | $360 | Not Implemented |
UD0859 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,512 | $10,150 | Not Implemented |
UD0859 # 02 Y:2012 | 02 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $581 | $600 | Implemented |
UD0859 # 03 Y:2012 | 03 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,313 | $100 | Not Implemented |
UD0859 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,041 | $2,000 | Not Implemented |
UD0859 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,953 | $1,000 | Implemented |
UD0859 # 06 Y:2012 | 06 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $20,256 | $6,033 | Implemented |
UD0859 # 07 Y:2012 | 07 | 2012 | REDUCE EXCESS STEAM BLEEDING | $20,148 | $0 | Implemented |
UD0859 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,768 | $2,000 | Implemented |
UD0859 # 09 Y:2012 | 09 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,869 | $10,000 | Not Implemented |
UD0859 # 10 Y:2012 | 10 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,657 | $5,000 | Not Implemented |
UD0857 # 01 Y:2012 | 01 | 2012 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $4,781 | $2,000 | Not Implemented |
UD0857 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,979 | $11,880 | Not Implemented |
UD0857 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,696 | $6,800 | Not Implemented |
UD0857 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,324 | $15,150 | Not Implemented |
UD0857 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $834 | $2,000 | Not Implemented |
UD0857 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $807 | $1,000 | Not Implemented |
UD0857 # 07 Y:2012 | 07 | 2012 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $7,051 | $2,000 | Not Implemented |