Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0518 # 04 Y:1997 | 04 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $3,330 | $0 | Implemented |
OK0518 # 05 Y:1997 | 05 | 1997 | MINIMIZE WATER USAGE | $47,695 | $7,520 | Not Implemented |
OK0518 # 06 Y:1997 | 06 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,220 | $2,561 | Implemented |
OK0517 # 01 Y:1997 | 01 | 1997 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $124,800 | $150,000 | Implemented |
OK0517 # 02 Y:1997 | 02 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $15,653 | $36,725 | Implemented |
OK0517 # 03 Y:1997 | 03 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,810 | $5,000 | Not Implemented |
OK0517 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $434 | $1,872 | Implemented |
OK0517 # 05 Y:1997 | 05 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $45 | $40 | Implemented |
OK0516 # 01 Y:1997 | 01 | 1997 | INSTALL SET-BACK TIMERS | $2,215 | $3,472 | Implemented |
OK0516 # 02 Y:1997 | 02 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,088 | $0 | Not Implemented |
OK0516 # 03 Y:1997 | 03 | 1997 | INSTALL OCCUPANCY SENSORS | $415 | $1,056 | Not Implemented |
OK0516 # 04 Y:1997 | 04 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $304 | $542 | Implemented |
OK0516 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $269 | $395 | Implemented |
OK0515 # 01 Y:1997 | 01 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,700 | $150 | Implemented |
OK0515 # 02 Y:1997 | 02 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $924 | $0 | Implemented |
OK0515 # 03 Y:1997 | 03 | 1997 | USE OTHER WASTE CONCENTRATION METHODS | $1,080 | $1,530 | Implemented |
OK0515 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,757 | $10,246 | Implemented |
OK0515 # 05 Y:1997 | 05 | 1997 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $26,000 | $0 | Implemented |
OK0515 # 06 Y:1997 | 06 | 1997 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,294 | $12,700 | Implemented |
OK0515 # 07 Y:1997 | 07 | 1997 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $6,825 | $50 | Not Implemented |
OK0514 # 01 Y:1997 | 01 | 1997 | INSTALL EQUIPMENT TO MOVE PRODUCT | $6,500 | $28,000 | Not Implemented |
OK0514 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,418 | $22,989 | Implemented |
OK0514 # 03 Y:1997 | 03 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,589 | $0 | Implemented |
OK0514 # 04 Y:1997 | 04 | 1997 | INSTALL OCCUPANCY SENSORS | $199 | $660 | Not Implemented |
OK0514 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $69 | $237 | Implemented |