IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0254 # 08 Y:1999 08 1999 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $51,100 $13,200 Implemented
AS0253 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,900 $4,824 Not Implemented
AS0253 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,416 $160 Not Implemented
AS0253 # 03 Y:1999 03 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,563 $1,200 Not Implemented
AS0253 # 04 Y:1999 04 1999 INSTALL TIMERS AND/OR THERMOSTATS $428 $225 Implemented
AS0253 # 05 Y:1999 05 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $468 $560 Implemented
AS0253 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,296 $60 Not Implemented
AS0253 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,611 $1,060 Implemented
AS0253 # 08 Y:1999 08 1999 PAY BILLS ON TIME TO AVOID LATE FEES $780 $60 Implemented
AS0253 # 09 Y:1999 09 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,737 $270 Not Implemented
SD0226 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,751 $4,040 Implemented
SD0226 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,824 $2,400 Not Implemented
SD0226 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,129 $50 Implemented
SD0226 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,584 $400 Implemented
SD0226 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $488 $800 Not Implemented
SD0226 # 06 Y:1999 06 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,751 $0 Implemented
SD0226 # 07 Y:1999 07 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,351 $169,125 Not Implemented
SD0226 # 08 Y:1999 08 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $903 $0 Implemented
SD0226 # 09 Y:1999 09 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,618 $0 Implemented
SD0226 # 10 Y:1999 10 1999 CONVERT TO AQUEOUS CLEANING $1,362 $0 Not Implemented
SD0226 # 11 Y:1999 11 1999 MAINTAIN MACHINES TO REDUCE LEAKS $1,103 $385 Implemented
SD0226 # 12 Y:1999 12 1999 INSTALL BACK-UP EQUIPMENT $1,728 $0 Not Implemented
NV0131 # 01 Y:1999 01 1999 INSULATE BARE EQUIPMENT $105 $200 Not Implemented
NV0131 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $1,146 $1,933 Not Implemented
NV0131 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,277 $638 Implemented