IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0174 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,405 $588 Implemented
UA0174 # 03 Y:2017 03 2017 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $49,747 $100,000 Not Implemented
UA0174 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $221 $564 Implemented
UA0174 # 05 Y:2017 05 2017 USE OPTIMUM TEMPERATURE $33,738 $8,460 Implemented
UA0174 # 06 Y:2017 06 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $826 $2,820 Implemented
UA0174 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,033 $42,204 Not Implemented
UK1612 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,720 $38,000 Not Implemented
UK1612 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,900 $0 Not Implemented
UK1612 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,934 $3,000 Not Implemented
UK1612 # 04 Y:2017 04 2017 INSTALL SKYLIGHTS $9,639 $11,580 Not Implemented
UK1612 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,475 $3,350 Not Implemented
UK1612 # 06 Y:2017 06 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $841 $72 Not Implemented
UK1612 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,376 $3,000 Not Implemented
UK1612 # 08 Y:2017 08 2017 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,221 $7,597 Not Implemented
UK1612 # 09 Y:2017 09 2017 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,810 $3,352 Not Implemented
UK1612 # 10 Y:2017 10 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $835 $0 Not Implemented
UK1612 # 11 Y:2017 11 2017 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,333 $0 Not Implemented
UK1612 # 12 Y:2017 12 2017 INSULATE BARE EQUIPMENT $1,083 $1,584 Not Implemented
UK1612 # 13 Y:2017 13 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,400 $422 Not Implemented
MA0769 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $90,487 $39,330 Implemented
MA0769 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,931 $24,720 Not Implemented
MA0769 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $12,391 $11,273 Not Implemented
MA0769 # 04 Y:2017 04 2017 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $8,620 $57,572 Not Implemented
MA0769 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,874 $7,200 Not Implemented
UM0481 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,978 $3,000 n/a