IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0329 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $626 $640 Implemented
WI0325 # 01 Y:1998 01 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $336,000 $240,000 Not Implemented
WI0325 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,848 $500 Implemented
WI0325 # 03 Y:1998 03 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,598 $10,000 Not Implemented
WI0325 # 04 Y:1998 04 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,590 $0 Not Implemented
WI0325 # 05 Y:1998 05 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $1,652 $0 Not Implemented
WI0325 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $756 $740 Not Implemented
WI0322 # 06 Y:1998 06 1998 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,817 $0 Not Implemented
WI0322 # 07 Y:1998 07 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,087 $600 Not Implemented
WI0322 # 08 Y:1998 08 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,376 $0 Not Implemented
WI0322 # 09 Y:1998 09 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $740 Not Implemented
WI0322 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $21,516 $1,000 Not Implemented
WI0322 # 02 Y:1998 02 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,052 $500 Not Implemented
WI0322 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $6,348 $1,000 Not Implemented
WI0322 # 04 Y:1998 04 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,205 $4,500 Not Implemented
WI0322 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,677 $9,000 Not Implemented
WI0320 # 01 Y:1998 01 1998 MOVE PRODUCT USING MECHANICAL MEANS $98,187 $100,000 Not Implemented
WI0320 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $4,771 $600 Not Implemented
WI0320 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,933 $6,400 Not Implemented
WI0320 # 04 Y:1998 04 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,532 $0 Not Implemented
WI0320 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,433 $7,000 Not Implemented
WI0320 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $650 $740 Implemented
WI0319 # 01 Y:1998 01 1998 INSTALL SENSORS TO DETECT DEFECTS $69,212 $63,760 Not Implemented
WI0319 # 02 Y:1998 02 1998 DISTILL CONTAMINATED SOLVENTS FOR REUSE $6,046 $13,200 Not Implemented
WI0319 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,599 $18,400 Not Implemented