IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0409 # 09 Y:2012 09 2012 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,782 $1,500 Not Implemented
BD0409 # 10 Y:2012 10 2012 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,032 $1,600 Not Implemented
BD0409 # 11 Y:2012 11 2012 USE EVAPORATION TO CONCENTRATE MATERIAL $153 $600 Not Implemented
LE0335 # 01 Y:2012 01 2012 USE EXISTING DAM TO GENERATE ELECTRICITY $1,144,296 $10,386,800 Not Implemented
LE0335 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $67,090 $3,825 Not Implemented
LE0335 # 03 Y:2012 03 2012 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $19,961 $32,500 Not Implemented
LE0335 # 04 Y:2012 04 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,946 $9,800 Not Implemented
LE0335 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,640 $1,000 Not Implemented
LE0335 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,534 $3,000 Not Implemented
LE0335 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,018 $44,640 Not Implemented
LE0335 # 08 Y:2012 08 2012 INSTALL TIMERS AND/OR THERMOSTATS $516 $125 Not Implemented
SD0445 # 01 Y:2012 01 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $33,123 $1,878 Implemented
SD0445 # 02 Y:2012 02 2012 REDESIGN PROCESS $30,890 $14,775 Not Implemented
SD0445 # 03 Y:2012 03 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $64,503 $109,675 Not Implemented
SD0445 # 04 Y:2012 04 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $351,013 $1,040,000 Implemented
SD0445 # 05 Y:2012 05 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,844 $39,150 Implemented
SD0445 # 06 Y:2012 06 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $84,757 $300,000 Implemented
SD0446 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $629 $100 Implemented
SD0446 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,854 $500 Implemented
SD0446 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,000 $4,045 Implemented
SD0446 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,478 $15,745 Implemented
SD0446 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,589 $3,425 Not Implemented
SD0446 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,195 $3,425 Not Implemented
IA0477 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,752 $52,500 Implemented
IA0477 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,202 $609 Not Implemented