Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0481 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,854 | $34,336 | n/a |
UM0481 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $18,599 | $6,600 | n/a |
UM0481 # 04 Y:2017 | 04 | 2017 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $50,498 | $100,000 | n/a |
IP0079 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,047 | $6 | Implemented |
IP0079 # 02 Y:2017 | 02 | 2017 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $3,466 | $0 | Not Implemented |
IP0079 # 03 Y:2017 | 03 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $35,073 | $678 | Not Implemented |
IP0079 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,340 | $147 | Implemented |
IP0079 # 05 Y:2017 | 05 | 2017 | COVER OPEN TANKS | $20,504 | $766 | Implemented |
IP0079 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $3,135 | $302 | Not Implemented |
IP0079 # 07 Y:2017 | 07 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,652 | $1,239 | Not Implemented |
IP0079 # 08 Y:2017 | 08 | 2017 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $742 | $90 | Implemented |
IP0079 # 09 Y:2017 | 09 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $38,196 | $5,000 | Implemented |
IP0079 # 10 Y:2017 | 10 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,415 | $9,367 | Not Implemented |
IP0079 # 11 Y:2017 | 11 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,761 | $2,448 | Not Implemented |
IP0079 # 12 Y:2017 | 12 | 2017 | OPTIMIZE PLANT POWER FACTOR | $23,934 | $35,575 | Implemented |
IP0079 # 13 Y:2017 | 13 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $2,977 | $5,000 | Implemented |
IP0079 # 14 Y:2017 | 14 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,861 | $3,300 | Not Implemented |
IP0079 # 15 Y:2017 | 15 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,112 | $79,976 | Not Implemented |
UU0114 # 01 Y:2017 | 01 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,236 | $180 | Implemented |
UU0114 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $14,409 | $30,000 | Not Implemented |
UU0114 # 03 Y:2017 | 03 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,931 | $0 | Implemented |
UU0114 # 04 Y:2017 | 04 | 2017 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,795 | $1,315 | Not Implemented |
UU0114 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,973 | $39,045 | Implemented |
UU0114 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,345 | $0 | Implemented |
SF0498 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,101 | $0 | Implemented |