IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0470 # 01 Y:2013 01 2013 REDUCE SCRAP PRODUCTION $34,364 $57,749 Implemented
SD0470 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $10,475 $32,420 Not Implemented
SD0470 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,854 $2,300 Implemented
SD0470 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $4,614 $4,625 Implemented
SD0470 # 05 Y:2013 05 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,160 $14,000 Not Implemented
SD0470 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,569 $600 Not Implemented
SD0470 # 07 Y:2013 07 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,245 $9,125 Not Implemented
SD0470 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,241 $2,390 Not Implemented
SF0431 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,402 $0 Not Implemented
SF0431 # 02 Y:2013 02 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $35,740 $12,095 Not Implemented
SF0431 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $24,335 $6,137 Not Implemented
SF0431 # 04 Y:2013 04 2013 INSTALL SET-BACK TIMERS $535 $210 Not Implemented
SF0431 # 05 Y:2013 05 2013 ADD AREA LIGHTING SWITCHES $10,130 $19,788 Implemented
SF0431 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,348 $83,669 Implemented
SF0431 # 07 Y:2013 07 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,616 $9,150 Not Implemented
SF0431 # 08 Y:2013 08 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,603 $121,742 Not Implemented
SD0468 # 01 Y:2013 01 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,265 $23,840 Implemented
SD0468 # 02 Y:2013 02 2013 MODIFY STARTUP/SHUTDOWN TIMES $7,607 $1,050 Implemented
SD0468 # 03 Y:2013 03 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,278 $1,600 Implemented
SD0468 # 04 Y:2013 04 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,973 $5,650 Not Implemented
SD0468 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,073 $700 Implemented
SD0467 # 01 Y:2013 01 2013 REDUCE SCRAP PRODUCTION $24,055 $56,924 Implemented
SD0467 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,483 $12,710 Implemented
SD0467 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,612 $500 Implemented
SD0467 # 04 Y:2013 04 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,318 $6,100 Not Implemented