Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0470 # 01 Y:2013 | 01 | 2013 | REDUCE SCRAP PRODUCTION | $34,364 | $57,749 | Implemented |
SD0470 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,475 | $32,420 | Not Implemented |
SD0470 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,854 | $2,300 | Implemented |
SD0470 # 04 Y:2013 | 04 | 2013 | USE PHOTOCELL CONTROLS | $4,614 | $4,625 | Implemented |
SD0470 # 05 Y:2013 | 05 | 2013 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,160 | $14,000 | Not Implemented |
SD0470 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,569 | $600 | Not Implemented |
SD0470 # 07 Y:2013 | 07 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,245 | $9,125 | Not Implemented |
SD0470 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,241 | $2,390 | Not Implemented |
SF0431 # 01 Y:2013 | 01 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,402 | $0 | Not Implemented |
SF0431 # 02 Y:2013 | 02 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $35,740 | $12,095 | Not Implemented |
SF0431 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $24,335 | $6,137 | Not Implemented |
SF0431 # 04 Y:2013 | 04 | 2013 | INSTALL SET-BACK TIMERS | $535 | $210 | Not Implemented |
SF0431 # 05 Y:2013 | 05 | 2013 | ADD AREA LIGHTING SWITCHES | $10,130 | $19,788 | Implemented |
SF0431 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,348 | $83,669 | Implemented |
SF0431 # 07 Y:2013 | 07 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,616 | $9,150 | Not Implemented |
SF0431 # 08 Y:2013 | 08 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $19,603 | $121,742 | Not Implemented |
SD0468 # 01 Y:2013 | 01 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $8,265 | $23,840 | Implemented |
SD0468 # 02 Y:2013 | 02 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $7,607 | $1,050 | Implemented |
SD0468 # 03 Y:2013 | 03 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,278 | $1,600 | Implemented |
SD0468 # 04 Y:2013 | 04 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,973 | $5,650 | Not Implemented |
SD0468 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,073 | $700 | Implemented |
SD0467 # 01 Y:2013 | 01 | 2013 | REDUCE SCRAP PRODUCTION | $24,055 | $56,924 | Implemented |
SD0467 # 02 Y:2013 | 02 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,483 | $12,710 | Implemented |
SD0467 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,612 | $500 | Implemented |
SD0467 # 04 Y:2013 | 04 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,318 | $6,100 | Not Implemented |