IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0142 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $1,742 $2,500 Not Implemented
UU0142 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,661 $0 Implemented
UU0142 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,532 $0 Implemented
UU0142 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $810 $129 Not Implemented
UU0142 # 07 Y:2019 07 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $288 $100 Implemented
MZ0262 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,670 $37,061 Implemented
MZ0262 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $3,589 $1,350 Implemented
MZ0262 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,138 $1,820 Not Implemented
MZ0262 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,400 $0 Not Implemented
MZ0262 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $850 $0 Not Implemented
MZ0262 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,156 $21,621 Not Implemented
MZ0262 # 07 Y:2019 07 2019 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $32,233 $65,000 Not Implemented
MZ0262 # 08 Y:2019 08 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,104 $8,000 Not Implemented
AS0465 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,350 $43,576 Not Implemented
AS0465 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $56,756 $18,258 Not Implemented
AS0465 # 03 Y:2019 03 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $41,936 $1,100 Not Implemented
AS0465 # 04 Y:2019 04 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,850 $17,634 Implemented
AS0465 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,608 $3,900 Not Implemented
AS0465 # 06 Y:2019 06 2019 RECOVER MECHANICAL ENERGY $4,582 $20,880 Not Implemented
OR0714 # 01 Y:2019 01 2019 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $56,799 $168,000 Not Implemented
OR0714 # 02 Y:2019 02 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $40,772 $23,842 Not Implemented
OR0714 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $21,372 $29,440 Not Implemented
OR0714 # 04 Y:2019 04 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,441 $23,733 Not Implemented
OR0714 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,732 $10,902 Not Implemented
LS1903 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,079 $150 Not Implemented