IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0308 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $216 $90 Implemented
WI0307 # 01 Y:1997 01 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $24,171 $500 Implemented
WI0307 # 02 Y:1997 02 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $14,040 $0 Not Implemented
WI0307 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,884 $0 Not Implemented
WI0307 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $721 $0 Implemented
WI0307 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $873 $640 Implemented
WI0307 # 06 Y:1997 06 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $331 $425 Implemented
WI0306 # 01 Y:1997 01 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $71,719 $240,000 Not Implemented
WI0306 # 02 Y:1997 02 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $6,278 $500 Not Implemented
WI0306 # 03 Y:1997 03 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,236 $5,000 Not Implemented
WI0306 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $420 $0 Not Implemented
WI0306 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $1,280 Not Implemented
WI0305 # 01 Y:1997 01 1997 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $28,500 $4,500 Implemented
WI0305 # 02 Y:1997 02 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $21,896 $55,000 Not Implemented
WI0305 # 03 Y:1997 03 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $16,529 $30,000 Not Implemented
WI0305 # 04 Y:1997 04 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $14,956 $1,000 Implemented
WI0305 # 05 Y:1997 05 1997 TREAT AND REUSE RINSE WATERS $9,755 $12,000 Not Implemented
WI0305 # 06 Y:1997 06 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,342 $10,000 Not Implemented
WI0305 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,234 $740 Implemented
WI0301 # 01 Y:1997 01 1997 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $36,464 $13,000 Not Implemented
WI0301 # 02 Y:1997 02 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $12,129 $500 Not Implemented
WI0301 # 03 Y:1997 03 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $10,763 $23,000 Implemented
WI0301 # 04 Y:1997 04 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,590 $1,000 Not Implemented
WI0301 # 05 Y:1997 05 1997 TREAT AND REUSE RINSE WATERS $3,396 $1,735 Not Implemented
WI0301 # 06 Y:1997 06 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $793 $0 Not Implemented