IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0274 # 11 Y:2001 11 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,333 $0 Implemented
UF0274 # 12 Y:2001 12 2001 IMPROVE SPACE COMFORT CONDITIONING $411,743 $9,000 Not Implemented
UF0274 # 13 Y:2001 13 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $108,000 $900,000 Implemented
SD0278 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $87,448 $164,000 Not Implemented
SD0278 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,045 $640 Not Implemented
SD0278 # 03 Y:2001 03 2001 INSTALL SKYLIGHTS $37,045 $37,000 Not Implemented
SD0278 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $802 $2,200 Not Implemented
SD0278 # 05 Y:2001 05 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $21,960 $30,000 Not Implemented
SD0278 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,178 $2,300 Not Implemented
SD0278 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,754 $8,000 Not Implemented
SD0278 # 08 Y:2001 08 2001 AUTOMATE FINISHING PROCESS $100,600 $120,000 Not Implemented
SD0278 # 09 Y:2001 09 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $113,800 $80,000 Not Implemented
UM0185 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,400 $600 Implemented
UM0185 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,546 $450 Implemented
UM0185 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $4,605 $24,000 Not Implemented
UM0185 # 04 Y:2001 04 2001 COVER OPEN TANKS $13,500 $12,000 Not Implemented
UM0185 # 05 Y:2001 05 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $50,525 $10,000 Implemented
UM0185 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $126,200 $115,000 Not Implemented
UM0185 # 07 Y:2001 07 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $28,800 $30,000 Not Implemented
TA0006 # 01 Y:2001 01 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $89,376 $40,000 n/a
TA0006 # 02 Y:2001 02 2001 COMBINE UTILITY METERS $9,444 $19,000 Implemented
TA0006 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,060 $367 Implemented
TA0006 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,518 $0 Implemented
TA0006 # 05 Y:2001 05 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $450 $35 Implemented
TA0006 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $114 $124 Not Implemented