Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0162 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,605 | $800 | Implemented |
DL0162 # 05 Y:2016 | 05 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,940 | $510 | Not Implemented |
DL0162 # 06 Y:2016 | 06 | 2016 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $18,175 | $10,500 | Implemented |
DL0162 # 07 Y:2016 | 07 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,730 | $1,820 | Implemented |
DL0162 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,930 | $29,230 | Implemented |
DL0161 # 01 Y:2016 | 01 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,700 | $6,000 | Not Implemented |
DL0161 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $144,770 | $285,230 | Not Implemented |
DL0161 # 03 Y:2016 | 03 | 2016 | USE EXISTING DAM TO GENERATE ELECTRICITY | $6,400 | $28,700 | Not Implemented |
DL0161 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,215 | $58,570 | Implemented |
DL0161 # 05 Y:2016 | 05 | 2016 | Install Anaerobic Digester | $990,000 | $6,000,000 | Not Implemented |
DL0161 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,450 | $21,270 | Implemented |
DL0161 # 07 Y:2016 | 07 | 2016 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $40,210 | $390,000 | Not Implemented |
WM0082 # 01 Y:2016 | 01 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,282 | $26,000 | Not Implemented |
WM0082 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,220 | $23,066 | Implemented |
WM0082 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,011 | $3,340 | Implemented |
WM0082 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $5,195 | $825 | Not Implemented |
WM0082 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,792 | $280 | Implemented |
WM0082 # 06 Y:2016 | 06 | 2016 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $5,896 | $2,068 | Not Implemented |
WM0082 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,050 | $1,650 | Not Implemented |
WM0082 # 08 Y:2016 | 08 | 2016 | USE SYNTHETIC LUBRICANT | $2,423 | $9,400 | Not Implemented |
UD0943 # 01 Y:2016 | 01 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $32,216 | $700 | Not Implemented |
UD0943 # 02 Y:2016 | 02 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $26,548 | $2,400 | Implemented |
UD0943 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,300 | $0 | Implemented |
UD0943 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $0 | Implemented |
UD0943 # 05 Y:2016 | 05 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $196 | $800 | Not Implemented |