IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0162 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,605 $800 Implemented
DL0162 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,940 $510 Not Implemented
DL0162 # 06 Y:2016 06 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $18,175 $10,500 Implemented
DL0162 # 07 Y:2016 07 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,730 $1,820 Implemented
DL0162 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,930 $29,230 Implemented
DL0161 # 01 Y:2016 01 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,700 $6,000 Not Implemented
DL0161 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $144,770 $285,230 Not Implemented
DL0161 # 03 Y:2016 03 2016 USE EXISTING DAM TO GENERATE ELECTRICITY $6,400 $28,700 Not Implemented
DL0161 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,215 $58,570 Implemented
DL0161 # 05 Y:2016 05 2016 Install Anaerobic Digester $990,000 $6,000,000 Not Implemented
DL0161 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,450 $21,270 Implemented
DL0161 # 07 Y:2016 07 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $40,210 $390,000 Not Implemented
WM0082 # 01 Y:2016 01 2016 RECOVER WASTE HEAT FROM EQUIPMENT $15,282 $26,000 Not Implemented
WM0082 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,220 $23,066 Implemented
WM0082 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,011 $3,340 Implemented
WM0082 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $5,195 $825 Not Implemented
WM0082 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $280 Implemented
WM0082 # 06 Y:2016 06 2016 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $5,896 $2,068 Not Implemented
WM0082 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,050 $1,650 Not Implemented
WM0082 # 08 Y:2016 08 2016 USE SYNTHETIC LUBRICANT $2,423 $9,400 Not Implemented
UD0943 # 01 Y:2016 01 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $32,216 $700 Not Implemented
UD0943 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,548 $2,400 Implemented
UD0943 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $0 Implemented
UD0943 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $0 Implemented
UD0943 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $196 $800 Not Implemented