IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0494 # 08 Y:1998 08 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $4,260 $9,000 Not Implemented
KU0494 # 09 Y:1998 09 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $30,350 $31,830 Implemented
KU0494 # 10 Y:1998 10 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,330 $6,280 Not Implemented
IA0195 # 01 Y:1998 01 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $19,062 $6,300 Implemented
IA0195 # 02 Y:1998 02 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,886 $2,000 Implemented
IA0195 # 03 Y:1998 03 1998 MOVE PRODUCT USING MECHANICAL MEANS $15,300 $8,676 Not Implemented
IA0195 # 04 Y:1998 04 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,783 $500 Implemented
IA0195 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,336 $130 Implemented
IA0195 # 06 Y:1998 06 1998 RECOVER MECHANICAL ENERGY $2,321 $3,413 Implemented
IA0195 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $940 $500 Implemented
IA0195 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $844 $3,478 Not Implemented
IA0195 # 09 Y:1998 09 1998 INSTALL OCCUPANCY SENSORS $800 $899 Not Implemented
UD0549 # 01 Y:1998 01 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $322,350 $250,000 Not Implemented
UD0549 # 02 Y:1998 02 1998 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $12,682 $0 Implemented
UD0549 # 03 Y:1998 03 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $3,343 $1,000 Not Implemented
UD0549 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,070 $3,903 Not Implemented
UD0549 # 05 Y:1998 05 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $736 $0 Implemented
UD0549 # 06 Y:1998 06 1998 RECOVER WASTE HEAT FROM EQUIPMENT $624 $500 Implemented
UD0549 # 07 Y:1998 07 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $204 $250 Not Implemented
SF0142 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $555 $349 Implemented
SF0142 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,271 $2,284 Implemented
SF0142 # 04 Y:1998 04 1998 USE PHOTOCELL CONTROLS $1,199 $1,000 Implemented
SF0142 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $1,711 $2,464 Implemented
SF0142 # 06 Y:1998 06 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,122 $1,600 Not Implemented
SF0142 # 07 Y:1998 07 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,821 $7,370 Not Implemented