IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0943 # 06 Y:2016 06 2016 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $24,866 $81,180 Not Implemented
UD0943 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,294 $4,525 Not Implemented
UD0943 # 08 Y:2016 08 2016 DEVELOP A REPAIR/REPLACE POLICY $411 $2,031 Not Implemented
UD0943 # 09 Y:2016 09 2016 CONTRACT A WOOD PALLET RECYCLING COMPANY $12,350 $0 Not Implemented
MA0755 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $73,133 $200,000 Not Implemented
MA0755 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $43,907 $196,307 Not Implemented
MA0755 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,196 $21,560 Implemented
MA0755 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,821 $4,300 Not Implemented
MA0755 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,678 $6,000 Not Implemented
MA0755 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,653 $2,955 Not Implemented
SU0407 # 01 Y:2016 01 2016 DISCONNECT BALLASTS $76 $0 Not Implemented
SU0407 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,191 $1,340 Not Implemented
SU0407 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,289 $737 Not Implemented
SU0407 # 04 Y:2016 04 2016 REDUCE VENTILATION AIR $5,800 $523 Not Implemented
SU0407 # 05 Y:2016 05 2016 ELIMINATE/REDUCE AN OPERATION $2,255 $1,215 Not Implemented
SU0407 # 06 Y:2016 06 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $231 $370 Not Implemented
SU0407 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $219 $312 Not Implemented
SU0407 # 08 Y:2016 08 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $181 $259 Not Implemented
SU0407 # 09 Y:2016 09 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $262 $591 Not Implemented
SU0407 # 10 Y:2016 10 2016 PAY BILLS ON TIME TO AVOID LATE FEES $1,597 $0 Implemented
NC0561 # 01 Y:2016 01 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,092 $8,000 Not Implemented
NC0561 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,608 $100 Implemented
NC0561 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,361 $200 Implemented
NC0561 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $552 $1,500 Implemented
NC0561 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,868 $143,752 Implemented