IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0075 # 05 Y:1996 05 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $7,248 $0 Not Implemented
UM0074 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,899 $16,317 Implemented
UM0074 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,905 $28,221 Implemented
UM0074 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $365 $500 Implemented
UM0074 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $3,903 $4,000 Not Implemented
UM0074 # 05 Y:1996 05 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,905 $30,800 Implemented
UM0074 # 06 Y:1996 06 1996 USE A RAG RECYCLE SERVICE $12,282 $4,095 Not Implemented
UF0165 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,572 $32,094 Not Implemented
UF0165 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,091 $2,802 Not Implemented
UF0165 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,841 $1,350 Implemented
UF0165 # 04 Y:1996 04 1996 CLEAN CONDENSER TUBES $19,869 $0 Implemented
UF0165 # 05 Y:1996 05 1996 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $10,500 $400 Not Implemented
UL0171 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $3,020 Implemented
UL0171 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $5,423 $6,179 Implemented
UL0171 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $195 $20 Not Implemented
UL0171 # 04 Y:1996 04 1996 RECOVER AND REUSE WASTE MATERIAL $1,860 $0 Not Implemented
UL0171 # 05 Y:1996 05 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,800 $0 Implemented
UL0171 # 06 Y:1996 06 1996 WASH AND REUSE RAGS ON-SITE $29,350 $4,300 Not Implemented
WI0285 # 01 Y:1996 01 1996 REDUCE VENTILATION AIR $210,013 $64,100 Not Implemented
WI0285 # 02 Y:1996 02 1996 INCREASE USE OF AUTOMATION $60,000 $140,000 Not Implemented
WI0285 # 03 Y:1996 03 1996 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,786 $0 Implemented
WI0285 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,042 $3,100 Not Implemented
WI0285 # 05 Y:1996 05 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,605 $8,500 Not Implemented
WI0285 # 06 Y:1996 06 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,549 $10,500 Not Implemented
WI0285 # 07 Y:1996 07 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,680 $1,216 Not Implemented