IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0065 # 09 Y:2003 09 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $306 $140 Implemented
TA0065 # 10 Y:2003 10 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $194 $0 Not Implemented
TA0065 # 11 Y:2003 11 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $146 $142 Not Implemented
IC0070 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,895 $46,610 Not Implemented
IC0070 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,127 $2,716 Not Implemented
IC0070 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $8,874 $22,864 Not Implemented
IC0070 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,638 $160,788 Not Implemented
IC0070 # 05 Y:2003 05 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,377 $0 Not Implemented
IC0070 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $56,367 $4,200 Implemented
IC0070 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $58,133 $0 Implemented
IC0070 # 08 Y:2003 08 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $73,846 $613,200 Not Implemented
UU0055 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $710 $710 Not Implemented
UU0055 # 02 Y:2003 02 2003 ADD AREA LIGHTING SWITCHES $659 $500 Not Implemented
UU0055 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $430 $1,870 Not Implemented
UU0055 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $889 $349 Not Implemented
UU0055 # 05 Y:2003 05 2003 USE HEAT PUMP FOR SPACE CONDITIONING $2,492 $39,000 Not Implemented
UU0055 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,273 $7,500 Not Implemented
UU0055 # 07 Y:2003 07 2003 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,956 $21,000 Not Implemented
WI0457 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,805 $11,000 Not Implemented
WI0457 # 02 Y:2003 02 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,965 $800 Not Implemented
WI0457 # 03 Y:2003 03 2003 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $3,333 $8,000 Not Implemented
WI0457 # 04 Y:2003 04 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,413 $0 Not Implemented
WI0457 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $936 $200 Not Implemented
WI0457 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $740 Not Implemented
OK0675 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $274 $256 Implemented