IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0324 # 07 Y:2006 07 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $9,724 $20,020 Not Implemented
SF0324 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,115 $24,600 Not Implemented
IA0384 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,454 $200 Implemented
IA0384 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,970 $1,000 Implemented
IA0384 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $735 Implemented
IA0384 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,056 $1,826 Implemented
IA0384 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $1,278 $924 Not Implemented
IA0384 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $747 $1,000 Implemented
IA0384 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $785 $990 Not Implemented
MI0124 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,063 $40,180 n/a
MI0124 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,719 $2,400 n/a
MI0124 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $28 n/a
MI0124 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $950 $1,018 n/a
MI0124 # 05 Y:2006 05 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,268 $31,176 n/a
MA0599 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $89,422 $172,300 Not Implemented
MA0599 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $20,495 $3,700 Not Implemented
MA0599 # 03 Y:2006 03 2006 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $17,205 $10,250 Implemented
MA0599 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $10,010 $5,280 Implemented
MA0599 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,780 $12,325 Implemented
MA0599 # 06 Y:2006 06 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,260 $1,190 Not Implemented
MA0599 # 07 Y:2006 07 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,051 $7,865 Implemented
MA0599 # 08 Y:2006 08 2006 REDUCE FLUID FLOW RATES $2,270 $600 Implemented
MA0599 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $627 $600 Implemented
CO0581 # 01 Y:2006 01 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,180 $450 Implemented
CO0581 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $430 $430 Not Implemented