Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0442 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $402 $955 Implemented
MA0442 # 07 Y:1999 07 1999 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $257 $640 Implemented
MA0439 # 01 Y:1999 01 1999 INSTALL AN UNINTERUPTABLE POWER SUPPLY $120,000 $24,000 Not Implemented
MA0439 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $8,636 $1,360 Implemented
MA0439 # 03 Y:1999 03 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,629 $500 Implemented
MA0439 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $4,578 $10,705 Not Implemented
MA0439 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,038 $1,295 Implemented
MA0439 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,116 $3,400 Not Implemented
MA0439 # 07 Y:1999 07 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $668 $1,244 Not Implemented
UD0571 # 01 Y:1999 01 1999 RECYCLE CASTING SAND $227,844 $135,000 Implemented
UD0571 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $67,000 $24,000 Not Implemented
UD0571 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $27,700 $40,000 Not Implemented
UD0571 # 04 Y:1999 04 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,000 $64,000 Implemented
UD0571 # 05 Y:1999 05 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $18,667 $0 Not Implemented
UD0571 # 06 Y:1999 06 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,800 $0 Not Implemented
UD0571 # 07 Y:1999 07 1999 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $9,000 $24,000 Not Implemented
UD0571 # 08 Y:1999 08 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,582 $0 Implemented
UD0571 # 09 Y:1999 09 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,489 $0 Not Implemented
WI0348 # 01 Y:1999 01 1999 ELIMINATE SHIFT $28,000 $40,000 Implemented
WI0348 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,083 $0 Not Implemented
WI0348 # 03 Y:1999 03 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,913 $18,000 Not Implemented
WI0348 # 04 Y:1999 04 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,867 $4,200 Implemented
WI0348 # 05 Y:1999 05 1999 USE A RAG RECYCLE SERVICE $843 $0 Not Implemented
WI0348 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $756 $142 Not Implemented
WI0348 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $229 $60 Implemented