Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0134 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $1,100 | $364 | Not Implemented |
LL0134 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $90 | Implemented |
LL0134 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $167 | $30 | Implemented |
LL0134 # 06 Y:2002 | 06 | 2002 | AUTOMATE FINISHING PROCESS | $142,800 | $377,995 | Not Implemented |
LL0134 # 07 Y:2002 | 07 | 2002 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $6,399 | $0 | Not Implemented |
UD0643 # 01 Y:2002 | 01 | 2002 | BURN A LESS EXPENSIVE GRADE OF FUEL | $32,894 | $90,000 | n/a |
UD0643 # 02 Y:2002 | 02 | 2002 | REPLACE BOILER | $24,688 | $93,993 | Not Implemented |
UD0643 # 03 Y:2002 | 03 | 2002 | BURN A LESS EXPENSIVE GRADE OF FUEL | $18,168 | $0 | Not Implemented |
UD0643 # 04 Y:2002 | 04 | 2002 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $11,525 | $0 | Not Implemented |
UD0643 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,904 | $25,000 | n/a |
UD0643 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,223 | $268 | Not Implemented |
UD0643 # 07 Y:2002 | 07 | 2002 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,989 | $11,500 | n/a |
UD0643 # 08 Y:2002 | 08 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $4,481 | $1,000 | Not Implemented |
UD0643 # 09 Y:2002 | 09 | 2002 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,882 | $1,000 | Not Implemented |
UD0643 # 10 Y:2002 | 10 | 2002 | USE PHOTOCELL CONTROLS | $1,370 | $825 | Not Implemented |
UD0643 # 11 Y:2002 | 11 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $254 | $300 | Not Implemented |
UM0213 # 01 Y:2002 | 01 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,905 | $1,000 | Not Implemented |
UM0213 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,927 | $71,714 | Implemented |
UM0213 # 03 Y:2002 | 03 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $23,514 | $500 | Implemented |
UM0213 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $22,460 | $3,600 | Implemented |
UM0213 # 05 Y:2002 | 05 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $11,201 | $500 | Implemented |
UM0213 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,292 | $3,000 | Implemented |
UM0213 # 07 Y:2002 | 07 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,355 | $1,468 | Implemented |
SU0134 # 01 Y:2002 | 01 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $14,024 | $6,613 | Not Implemented |
SU0134 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,420 | $89 | Implemented |