Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0966 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,382 | $9,263 | Implemented |
GT0966 # 07 Y:2023 | 07 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,955 | $13,403 | Not Implemented |
GT0966 # 08 Y:2023 | 08 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $380,920 | $4,818,307 | Not Implemented |
LE0547 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $846 | $400 | Implemented |
LE0547 # 02 Y:2023 | 02 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,446 | $1,500 | Not Implemented |
LE0547 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $602 | $1,720 | Implemented |
LE0547 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,448 | $13,930 | Implemented |
LE0547 # 05 Y:2023 | 05 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $6,147 | $30,000 | Not Implemented |
UU0219 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $242,311 | $1,768,555 | Not Implemented |
UU0219 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,112 | $13,345 | Implemented |
UU0219 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,350 | $2,350 | Not Implemented |
UU0219 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,850 | $18,236 | Not Implemented |
UU0219 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,272 | $172 | Not Implemented |
UU0219 # 06 Y:2023 | 06 | 2023 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $1,035 | $729 | Not Implemented |
MZ0346 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $825 | $2,925 | Implemented |
MZ0346 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $967 | $320 | Not Implemented |
MZ0346 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,048 | $6,536 | Not Implemented |
MZ0346 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $425 | $485 | Not Implemented |
MZ0346 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $146 | $200 | Implemented |
UD1055 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $109,446 | $0 | Not Implemented |
UD1055 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,342 | $952 | Not Implemented |
UD1055 # 03 Y:2023 | 03 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $4,980 | $600 | Not Implemented |
UD1055 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $716 | $0 | Implemented |
UD1055 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $499 | $675 | Not Implemented |
UD1055 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $4,478 | $2,800 | Not Implemented |