IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0140 # 05 Y:1998 05 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,555 $200 Implemented
NC0140 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,915 $1,448 Not Implemented
NC0140 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $5,400 $200 Not Implemented
NC0140 # 08 Y:1998 08 1998 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $47,500 $135,000 Not Implemented
NC0140 # 09 Y:1998 09 1998 ADD ADDITIONAL PRODUCTION SHIFT $237,500 $12,000 Implemented
NC0139 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,306 $18,000 Not Implemented
NC0139 # 02 Y:1998 02 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,424 $1,800 Implemented
NC0139 # 03 Y:1998 03 1998 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $34,875 $2,500 Not Implemented
NC0139 # 04 Y:1998 04 1998 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,815 $25,000 Not Implemented
NC0139 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $42,277 $70,000 Not Implemented
NC0139 # 06 Y:1998 06 1998 USE OTHER WASTE CONCENTRATION METHODS $4,704 $4,000 Not Implemented
NC0139 # 07 Y:1998 07 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $418,000 $750,000 Not Implemented
NC0138 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $525 $1,431 Not Implemented
NC0138 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,312 $0 Not Implemented
NC0138 # 03 Y:1998 03 1998 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,915 $0 Implemented
NC0138 # 04 Y:1998 04 1998 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,267 $0 Implemented
NC0138 # 05 Y:1998 05 1998 RECOVER AND REUSE COOLING WATER $1,815 $1,500 Not Implemented
NC0138 # 06 Y:1998 06 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $113 $200 Not Implemented
NC0138 # 07 Y:1998 07 1998 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $754 $2,500 Not Implemented
NC0133 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,797 $7,696 Implemented
NC0133 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,905 $1,400 Implemented
NC0133 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,181 $27,560 Not Implemented
NC0133 # 04 Y:1998 04 1998 RECOVER AND REUSE COOLING WATER $97,026 $2,000 Implemented
NC0133 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $18,252 $35,000 Not Implemented
NC0133 # 06 Y:1998 06 1998 ADD ADDITIONAL PRODUCTION SHIFT $500,800 $0 Implemented