Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,875
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0171 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,145 | $27,936 | Not Implemented |
SU0170 # 01 Y:2003 | 01 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,400 | $0 | Not Implemented |
SU0170 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,210 | $0 | Not Implemented |
SU0170 # 03 Y:2003 | 03 | 2003 | ADVERTISE PRODUCT OR SERVICE | $31,250 | $1,000 | Implemented |
SU0170 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,181 | $47 | Implemented |
SU0170 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $466 | $57 | Implemented |
SU0170 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,229 | $185 | Implemented |
SU0170 # 07 Y:2003 | 07 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $21,666 | $16,761 | Not Implemented |
SU0170 # 08 Y:2003 | 08 | 2003 | REPLACE BOILER | $10,809 | $33,514 | Not Implemented |
SU0169 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,694 | $0 | Implemented |
SU0169 # 02 Y:2003 | 02 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,040 | $348 | Implemented |
SU0169 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,194 | $26 | Implemented |
SU0169 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $168 | Implemented |
SU0169 # 05 Y:2003 | 05 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $10,608 | $9,520 | Not Implemented |
SU0169 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,846 | $7,106 | Not Implemented |
SU0168 # 01 Y:2003 | 01 | 2003 | USE POWER DURING OFF-PEAK PERIODS | $5,551 | $0 | Implemented |
SU0168 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,251 | $0 | Implemented |
SU0168 # 03 Y:2003 | 03 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,295 | $0 | Implemented |
SU0168 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,662 | $85 | Not Implemented |
SU0168 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,037 | $227 | Implemented |
SU0168 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,579 | $9,450 | Not Implemented |
SU0168 # 07 Y:2003 | 07 | 2003 | MOVE BOILER TO MORE EFFICIENT LOCATION | $5,735 | $18,000 | Not Implemented |
SU0167 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $839 | $0 | Implemented |
SU0167 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $633 | $0 | Not Implemented |
SU0167 # 03 Y:2003 | 03 | 2003 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $8,152 | $147 | Not Implemented |