IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0137 # 01 Y:1998 01 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $518 $658 Not Implemented
NC0137 # 02 Y:1998 02 1998 INSULATE FEEDWATER TANK $57 $90 Not Implemented
NC0137 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,470 $325 Implemented
NC0137 # 04 Y:1998 04 1998 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,303 $3,000 Implemented
NC0137 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $10,440 $200 Not Implemented
NC0137 # 06 Y:1998 06 1998 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $1,035 $4,000 Implemented
NC0137 # 07 Y:1998 07 1998 EXPAND OPERATIONS INTO UNUSED SPACE $104,500 $168,500 Implemented
TN0634 # 01 Y:1998 01 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $84,680 $200,000 Implemented
TN0634 # 02 Y:1998 02 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $67,500 $50,000 Implemented
TN0634 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,720 $2,600 Implemented
TN0634 # 04 Y:1998 04 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $3,600 $0 Not Implemented
TN0634 # 05 Y:1998 05 1998 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,990 $8,575 Not Implemented
TN0634 # 06 Y:1998 06 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,990 $510 Implemented
TN0634 # 07 Y:1998 07 1998 USE MINIMUM STEAM OPERATING PRESSURE $1,460 $0 Not Implemented
TN0634 # 08 Y:1998 08 1998 AIR CONDITION ONLY SPACE NECESSARY $1,310 $0 Not Implemented
TN0634 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,038 $1,820 Implemented
TN0634 # 10 Y:1998 10 1998 INSULATE BARE EQUIPMENT $430 $390 Not Implemented
TN0634 # 11 Y:1998 11 1998 RECOVER WASTE HEAT FROM EQUIPMENT $320 $960 Implemented
TN0634 # 12 Y:1998 12 1998 REPAIR AND ELIMINATE STEAM LEAKS $310 $295 Implemented
TN0634 # 13 Y:1998 13 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $310 $500 Implemented
TN0632 # 01 Y:1998 01 1998 METER WASTE WATER $18,830 $3,300 Implemented
TN0632 # 02 Y:1998 02 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,750 $14,700 Not Implemented
TN0632 # 03 Y:1998 03 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,020 $0 Not Implemented
TN0632 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,890 $3,260 Not Implemented
TN0632 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,480 $1,680 Not Implemented