Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,405
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0141 # 09 Y:1998 | 09 | 1998 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $22,000 | $67,000 | Not Implemented |
NC0141 # 10 Y:1998 | 10 | 1998 | INSTALL EQUIPMENT TO MOVE PRODUCT | $14,000 | $50,000 | Not Implemented |
NC0141 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $556 | $60 | Implemented |
NC0141 # 02 Y:1998 | 02 | 1998 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $5,943 | $10,000 | Implemented |
NC0141 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,183 | $4,236 | Implemented |
NC0141 # 04 Y:1998 | 04 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $31,048 | $4,000 | Implemented |
NC0141 # 05 Y:1998 | 05 | 1998 | INSTALL TURBULATORS | $11,553 | $3,500 | Not Implemented |
NC0141 # 06 Y:1998 | 06 | 1998 | BURN A LESS EXPENSIVE GRADE OF FUEL | $6,874 | $0 | Not Implemented |
NC0141 # 07 Y:1998 | 07 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,861 | $200 | Implemented |
TN0646 # 01 Y:1998 | 01 | 1998 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $603,410 | $51,350 | Implemented |
TN0646 # 02 Y:1998 | 02 | 1998 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $28,800 | $21,900 | Implemented |
TN0646 # 03 Y:1998 | 03 | 1998 | ADD AREA LIGHTING SWITCHES | $8,900 | $13,600 | Implemented |
TN0646 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,325 | $5,000 | Implemented |
TN0646 # 05 Y:1998 | 05 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,880 | $0 | Implemented |
TN0646 # 06 Y:1998 | 06 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,600 | $0 | Not Implemented |
NC0151 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,157 | $600 | Not Implemented |
NC0151 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $33,411 | $132,700 | Not Implemented |
NC0151 # 03 Y:1998 | 03 | 1998 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $401 | $1,500 | Not Implemented |
NC0151 # 04 Y:1998 | 04 | 1998 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $700 | $2,100 | Not Implemented |
NC0151 # 05 Y:1998 | 05 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,290 | $3,000 | Not Implemented |
NC0151 # 06 Y:1998 | 06 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,822 | $15,000 | Not Implemented |
NC0151 # 07 Y:1998 | 07 | 1998 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $11,500 | $45,000 | Not Implemented |
NC0151 # 08 Y:1998 | 08 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,721 | $16,000 | Not Implemented |
NC0145 # 01 Y:1998 | 01 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,611 | $25,000 | Not Implemented |
NC0145 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $33,755 | $125,000 | Not Implemented |