IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0322 # 06 Y:1999 06 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $65 $20 Not Implemented
GT0663 # 01 Y:1999 01 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $9,639 $0 Not Implemented
GT0663 # 02 Y:1999 02 1999 COMBINE UTILITY METERS $1,117 $0 Not Implemented
GT0663 # 03 Y:1999 03 1999 COMBINE UTILITY METERS $7,755 $0 Not Implemented
GT0663 # 04 Y:1999 04 1999 MINIMIZE WATER USAGE $113 $0 Not Implemented
GT0663 # 05 Y:1999 05 1999 COMBINE UTILITY METERS $375 $0 Not Implemented
GT0663 # 06 Y:1999 06 1999 METER WASTE WATER $980 $400 Not Implemented
GT0663 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,035 $5,000 Not Implemented
GT0663 # 08 Y:1999 08 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,250 $6,700 Not Implemented
GT0663 # 09 Y:1999 09 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,805 $4,600 Not Implemented
GT0663 # 10 Y:1999 10 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $10,000 $0 Not Implemented
AR0162 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,102 $270 Not Implemented
AR0162 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $636 $952 Implemented
AR0162 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $3,144 $3,881 Not Implemented
AR0162 # 04 Y:1999 04 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $27,490 $5,600 Not Implemented
AR0162 # 05 Y:1999 05 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $29,203 $0 Implemented
AR0162 # 06 Y:1999 06 1999 INCREASE USE OF AUTOMATION $29,203 $25,000 Implemented
WV0166 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $3,196 $12,350 Not Implemented
WV0166 # 02 Y:1999 02 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,652 $4,300 Not Implemented
WV0166 # 03 Y:1999 03 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $600 $1,290 Not Implemented
WV0166 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $24,192 $5,439 Implemented
WV0166 # 05 Y:1999 05 1999 DISCONNECT BALLASTS $203 $80 Implemented
WV0166 # 06 Y:1999 06 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $36 $0 Implemented
WV0166 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $198 Not Implemented
WV0166 # 08 Y:1999 08 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $54,120 $0 Implemented