IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,102

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0241 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $7,740 $10,080 Implemented
UU0241 # 04 Y:2024 04 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,480 $6,000 Implemented
UU0241 # 05 Y:2024 05 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,300 $7,800 Not Implemented
UU0241 # 06 Y:2024 06 2024 INSULATE BARE EQUIPMENT $1,150 $3,710 Not Implemented
UU0241 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $650 $2,200 Not Implemented
UU0241 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $589 $750 Implemented
UW2402 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,442 $5,083 n/a
UW2402 # 02 Y:2024 02 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,045 $582 n/a
UW2402 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $282 $1,742 n/a
UW2402 # 04 Y:2024 04 2024 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $55,000 $117,000 n/a
UW2402 # 05 Y:2024 05 2024 USE OTHER WASTE CONCENTRATION METHODS $25,000 $104,000 n/a
UW2402 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $17,310 $375 n/a
UW2402 # 07 Y:2024 07 2024 USE SOLAR HEAT TO HEAT WATER $13,327 $84,652 n/a
UW2402 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $49,076 $311,400 n/a
WM0214 # 01 Y:2024 01 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,388 $6,030 Not Implemented
WM0214 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,590 $2,250 Implemented
WM0214 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,880 $1,500 Implemented
WM0214 # 04 Y:2024 04 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,508 $0 Implemented
CI0028 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $117,628 $341,230 n/a
CI0028 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $43,415 $1,900 n/a
CI0028 # 03 Y:2024 03 2024 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $14,256 $92,800 n/a
CI0028 # 04 Y:2024 04 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,253 $80,000 n/a
CI0028 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $5,668 $5,200 n/a
CI0028 # 06 Y:2024 06 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,530 $11,000 n/a
CI0028 # 07 Y:2024 07 2024 MINIMIZE WATER USAGE $5,321 $22,000 n/a