IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0159 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $1,187 $800 Implemented
SU0159 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,171 $0 Implemented
SU0159 # 05 Y:2003 05 2003 REPLACE BOILER $1,148 $13,507 Implemented
SU0159 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
SU0159 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $276 $523 Implemented
SU0157 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $45,993 $0 Not Implemented
SU0157 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,969 $11,310 Not Implemented
SU0157 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,728 $2,468 Not Implemented
SU0157 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,835 $0 Implemented
SU0157 # 05 Y:2003 05 2003 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,647 $8,000 Not Implemented
SU0157 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,020 $7,486 Not Implemented
SU0157 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,147 $0 Implemented
SU0157 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $858 $0 Not Implemented
SU0157 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $849 $640 Not Implemented
SU0157 # 10 Y:2003 10 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $803 $406 Not Implemented
SU0157 # 11 Y:2003 11 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $376 $558 Implemented
SU0155 # 01 Y:2003 01 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $20,634 $768 Not Implemented
SU0155 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,787 $1,200 Implemented
SU0155 # 03 Y:2003 03 2003 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,200 $8,636 Not Implemented
SU0155 # 04 Y:2003 04 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,056 $0 Implemented
SU0155 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,016 $0 Implemented
SU0155 # 06 Y:2003 06 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,195 $4,877 Not Implemented
SU0155 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $320 Implemented
SU0155 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,406 $420 Not Implemented
SU0155 # 09 Y:2003 09 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $901 $1,660 Not Implemented