IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0166 # 09 Y:1997 09 1997 OPTIMIZE PLANT POWER FACTOR $1,096 $4,700 Implemented
IA0166 # 10 Y:1997 10 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $3,374 Implemented
IA0166 # 11 Y:1997 11 1997 INSTALL OCCUPANCY SENSORS $471 $906 Not Implemented
UD0519 # 01 Y:1997 01 1997 USE GRAVITY FEEDS WHEREVER POSSIBLE $9,099 $5,828 Implemented
UD0519 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $1,915 Implemented
UD0519 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $453 $888 Implemented
UD0519 # 04 Y:1997 04 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $811 $0 Implemented
UD0519 # 05 Y:1997 05 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $14,413 $6,000 Implemented
UM0088 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,784 $4,207 Implemented
UM0088 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,346 $12,020 Implemented
UM0088 # 03 Y:1997 03 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,864 $37,700 Implemented
UM0088 # 04 Y:1997 04 1997 IMPROVE COMBUSTION CONTROL CAPABILITY $13,512 $22,440 Implemented
UM0088 # 05 Y:1997 05 1997 MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING $16,379 $1,440 Implemented
UM0088 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,519 $0 Implemented
UM0088 # 07 Y:1997 07 1997 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $557 $1,500 Implemented
OD0082 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,553 $989 Not Implemented
OD0082 # 02 Y:1997 02 1997 USE SYNTHETIC LUBRICANT $503 $520 Not Implemented
OD0082 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,150 $10,066 Not Implemented
OD0082 # 04 Y:1997 04 1997 BURN WASTE OIL FOR HEAT $3,300 $5,320 Not Implemented
OD0082 # 05 Y:1997 05 1997 CLEAR AND RENT EXISTING SPACE $50,000 $1,600 Not Implemented
AS0204 # 01 Y:1997 01 1997 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $63,320 $2,400 Not Implemented
AS0204 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,248 $16,974 Not Implemented
AS0204 # 03 Y:1997 03 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,113 $8,000 Not Implemented
AS0204 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,786 $60 Not Implemented
AS0204 # 05 Y:1997 05 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,579 $0 Not Implemented