IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0435 # 03 Y:2003 03 2003 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $4,670 $0 Not Implemented
AM0435 # 04 Y:2003 04 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,100 $0 Implemented
AM0435 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $950 $235 Not Implemented
AM0435 # 06 Y:2003 06 2003 USE PHOTOCELL CONTROLS $775 $75 Implemented
AS0352 # 01 Y:2003 01 2003 INSTALL SKYLIGHTS $1,977 $4,374 Not Implemented
AS0352 # 02 Y:2003 02 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $402 $1,000 Implemented
AS0352 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,619 $120 Implemented
AS0352 # 04 Y:2003 04 2003 USE HEAT PUMP FOR SPACE CONDITIONING $4,075 $700 Not Implemented
AS0352 # 05 Y:2003 05 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $194 $0 Implemented
AS0352 # 06 Y:2003 06 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $29,631 $1,380 Implemented
AS0352 # 07 Y:2003 07 2003 CLEAR AND RENT EXISTING SPACE $12,132 $9,260 Implemented
AS0351 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,729 $60 Implemented
AS0351 # 03 Y:2003 03 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $462 $1,000 Not Implemented
AS0351 # 04 Y:2003 04 2003 BURN A LESS EXPENSIVE GRADE OF FUEL $26,419 $6,500 Implemented
AS0351 # 05 Y:2003 05 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $10,220 $805 Implemented
AS0351 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $15 Not Implemented
LL0161 # 01 Y:2003 01 2003 USE PHOTOCELL CONTROLS $6,194 $328 Not Implemented
LL0161 # 02 Y:2003 02 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,952 $2,121 Implemented
LL0161 # 03 Y:2003 03 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,921 $192 Implemented
LL0161 # 04 Y:2003 04 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,034 $763 Not Implemented
LL0161 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $641 $20 Implemented
LL0161 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $534 $520 Not Implemented
LL0161 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $402 $210 Not Implemented
IC0058 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $9,774 Implemented
IC0058 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,668 $1,551 Implemented