IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0204 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,288 $3,115 Not Implemented
AS0204 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,188 $1,381 Not Implemented
AS0204 # 08 Y:1997 08 1997 INSTALL OCCUPANCY SENSORS $696 $1,650 Not Implemented
AS0204 # 09 Y:1997 09 1997 INSTALL TIMERS AND/OR THERMOSTATS $324 $320 Not Implemented
AS0204 # 10 Y:1997 10 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $36,527 $13,260 Not Implemented
AS0204 # 11 Y:1997 11 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $56,857 $66,040 Not Implemented
AS0204 # 12 Y:1997 12 1997 CLEAR AND RENT EXISTING SPACE $9,169 $19,200 Not Implemented
DS0092 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,439 $2,055 Not Implemented
DS0092 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $280 Implemented
DS0092 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $134 $182 Implemented
DS0092 # 04 Y:1997 04 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,905 $2,100 Not Implemented
DS0092 # 05 Y:1997 05 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,123 $700 Not Implemented
DS0092 # 06 Y:1997 06 1997 USE A RAG RECYCLE SERVICE $227 $750 Not Implemented
DS0092 # 07 Y:1997 07 1997 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $12,302 $5,500 Implemented
DS0092 # 08 Y:1997 08 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,893 $360 Implemented
DS0093 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $802 $1,500 Implemented
DS0093 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $431 $24 Implemented
DS0093 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $250 $500 Not Implemented
DS0093 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $76 Implemented
DS0093 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $851 $4,500 Not Implemented
DS0093 # 06 Y:1997 06 1997 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $37,008 $11,176 Implemented
DS0093 # 07 Y:1997 07 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,020 $1,016 Implemented
BD0086 # 01 Y:1997 01 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,412 $2,845 Not Implemented
BD0086 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,569 $1,500 Not Implemented
BD0086 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,196 $520 Not Implemented