Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0730 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $15,651 | $5,000 | Not Implemented |
OR0730 # 02 Y:2019 | 02 | 2019 | MODIFY WORKLOAD | $13,223 | $18,824 | Not Implemented |
OR0730 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,201 | $0 | Not Implemented |
OR0730 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $2,657 | $9,364 | Not Implemented |
OR0730 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,030 | $2,058 | Not Implemented |
OR0729 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $14,812 | $38,672 | Implemented |
OR0729 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,737 | $17,500 | Not Implemented |
OR0729 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,791 | $13,791 | Implemented |
OR0729 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,586 | $8,701 | Not Implemented |
OR0729 # 05 Y:2019 | 05 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,870 | $566,544 | Not Implemented |
OR0728 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,023 | $34,574 | Not Implemented |
OR0728 # 02 Y:2019 | 02 | 2019 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $29,427 | $34,054 | Not Implemented |
OR0728 # 03 Y:2019 | 03 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,174 | $4,152 | Not Implemented |
OR0728 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,008 | $0 | Implemented |
OR0727 # 01 Y:2019 | 01 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,245,906 | $300,000 | Not Implemented |
OR0727 # 02 Y:2019 | 02 | 2019 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $125,609 | $904,500 | Not Implemented |
OR0727 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,870 | $19,006 | Implemented |
OR0727 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,255 | $770 | Implemented |
OR0726 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,581 | $7,570 | Implemented |
OR0726 # 02 Y:2019 | 02 | 2019 | REDUCE VENTILATION AIR | $1,259 | $0 | Implemented |
OR0726 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,031 | $3,570 | Not Implemented |
OR0725 # 01 Y:2019 | 01 | 2019 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $16,581 | $12,780 | Not Implemented |
OR0725 # 02 Y:2019 | 02 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $58,445 | $110,790 | Implemented |
OR0725 # 03 Y:2019 | 03 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $126,211 | $375,000 | Implemented |
OR0725 # 04 Y:2019 | 04 | 2019 | REPLACE BOILER | $2,159 | $0 | Not Implemented |