Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
100,077
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0259 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,620 | $30,000 | n/a |
DL0259 # 03 Y:2025 | 03 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $3,091 | $13,000 | n/a |
DL0259 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,217 | $5,500 | n/a |
DL0259 # 05 Y:2025 | 05 | 2025 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $10,050 | $40,000 | n/a |
UF0630 # 01 Y:2025 | 01 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $66,329 | $8,820 | n/a |
UF0630 # 02 Y:2025 | 02 | 2025 | KEEP SOLID FUELS / RAW MATERIALS DRY | $25,034 | $48,000 | n/a |
UF0630 # 03 Y:2025 | 03 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $12,224 | $8,907 | n/a |
UF0630 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $2,000 | n/a |
UF0630 # 05 Y:2025 | 05 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $40,000 | n/a |
UF0630 # 06 Y:2025 | 06 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,264 | $14,760 | n/a |
UF0630 # 07 Y:2025 | 07 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,407 | $25,400 | n/a |
UF0630 # 08 Y:2025 | 08 | 2025 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,256 | $2,120 | n/a |
UF0630 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $958 | $0 | n/a |
UF0630 # 10 Y:2025 | 10 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $625 | $1,750 | n/a |
UF0630 # 11 Y:2025 | 11 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $11,572 | $20,000 | n/a |
UF0630 # 12 Y:2025 | 12 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $1,323 | $0 | n/a |
DL0258 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $2,112 | $5,500 | n/a |
DL0258 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,808 | $25,000 | n/a |
DL0258 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,102 | $3,500 | n/a |
DL0258 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,565 | $200 | n/a |
LS2512 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,432 | $1,275 | n/a |
LS2512 # 02 Y:2025 | 02 | 2025 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $16,150 | $25,000 | n/a |
LS2512 # 03 Y:2025 | 03 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,381 | $25,003 | n/a |
LS2512 # 04 Y:2025 | 04 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $27,997 | $144,549 | n/a |
LS2512 # 05 Y:2025 | 05 | 2025 | REPLACE BOILER | $31,301 | $286,589 | n/a |