IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0907 # 04 Y:2017 04 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $519 $3,858 Not Implemented
NC0605 # 01 Y:2017 01 2017 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $23,044 $93,000 Not Implemented
NC0605 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,828 $10,328 Implemented
NC0605 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $118 $50 Implemented
NC0605 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $812 $1,000 Not Implemented
NC0605 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $2,000 Implemented
NC0605 # 06 Y:2017 06 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $65,888 $500 Implemented
NC0605 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $3,455 $11,302 Implemented
NC0604 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,606 $3,300 Not Implemented
NC0604 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $452 $1,000 Not Implemented
NC0604 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $311 $200 Not Implemented
NC0604 # 04 Y:2017 04 2017 DEVELOP A REPAIR/REPLACE POLICY $505 $2,577 Not Implemented
OR0692 # 01 Y:2017 01 2017 REDUCE FLUID FLOW RATES $26,801 $7,395 Not Implemented
OR0692 # 02 Y:2017 02 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,636 $3,060 Not Implemented
OR0692 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,299 $3,670 Not Implemented
SU0452 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,109 $0 Implemented
SU0452 # 02 Y:2017 02 2017 PAY BILLS ON TIME TO AVOID LATE FEES $2,111 $0 Not Implemented
SU0452 # 03 Y:2017 03 2017 ELIMINATE/REDUCE AN OPERATION $16,784 $4,317 Implemented
SU0452 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $347 $524 Implemented
SU0452 # 05 Y:2017 05 2017 UPGRADE OBSOLETE EQUIPMENT $25,555 $120,000 Implemented
CL1705 # 01 Y:2017 01 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $148,148 $211,152 Not Implemented
CL1705 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $95,734 $244,620 Not Implemented
CL1705 # 03 Y:2017 03 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $15,929 $3,050 Not Implemented
CL1705 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,097 $900 Not Implemented
SD0557 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $43,867 $5,775 Not Implemented