Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,723
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0157 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $91,892 | $111,815 | Not Implemented |
MI0157 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,557 | $1,210 | Not Implemented |
MI0157 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,187 | $40 | Not Implemented |
MI0157 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,330 | $1,210 | Not Implemented |
MI0157 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,639 | $40 | Not Implemented |
MI0157 # 06 Y:2007 | 06 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,802 | $3,475 | Not Implemented |
MI0157 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,172 | $1,210 | Not Implemented |
MI0157 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,540 | $40 | Not Implemented |
MI0157 # 09 Y:2007 | 09 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,765 | $3,475 | Not Implemented |
MI0157 # 10 Y:2007 | 10 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,435 | $1,210 | Not Implemented |
UF0406 # 01 Y:2007 | 01 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,441 | $253 | Not Implemented |
UF0406 # 02 Y:2007 | 02 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $372 | $289 | Not Implemented |
UF0406 # 03 Y:2007 | 03 | 2007 | INSTALL SET-BACK TIMERS | $6,690 | $625 | Not Implemented |
UF0406 # 04 Y:2007 | 04 | 2007 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $6,004 | $399 | Not Implemented |
UF0406 # 05 Y:2007 | 05 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $17,857 | $619 | Implemented |
UF0406 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,557 | $714 | Implemented |
UF0406 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $229,959 | $0 | Implemented |
UF0406 # 08 Y:2007 | 08 | 2007 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $6,754 | $22,000 | Not Implemented |
UF0406 # 09 Y:2007 | 09 | 2007 | USE OPTIMUM THICKNESS INSULATION | $7,084 | $1,380 | Implemented |
UF0406 # 10 Y:2007 | 10 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,733 | $6,479 | Not Implemented |
UF0406 # 11 Y:2007 | 11 | 2007 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $4,744,561 | $5,831 | Not Implemented |
UF0405 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,407 | $51,387 | Implemented |
UF0405 # 02 Y:2007 | 02 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $4,716 | $834 | Not Implemented |
UF0405 # 03 Y:2007 | 03 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,532 | $545 | Implemented |
UF0405 # 04 Y:2007 | 04 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $8,668 | $0 | Implemented |