IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0415 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $928 $3,000 Not Implemented
AS0415 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $810 $12,174 Not Implemented
AS0415 # 06 Y:2006 06 2006 USE SOLAR HEAT TO HEAT WATER $132 $2,800 Not Implemented
UD0734 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,890 $19,500 Implemented
UD0734 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $5,301 $0 Not Implemented
UD0734 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,023 $1,900 Implemented
UD0734 # 04 Y:2006 04 2006 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $2,800 $0 Implemented
UD0734 # 05 Y:2006 05 2006 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,510 $0 Implemented
UD0734 # 06 Y:2006 06 2006 USE OPTIMUM THICKNESS INSULATION $2,141 $3,500 Not Implemented
UD0734 # 07 Y:2006 07 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,798 $8,041 Implemented
UD0734 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $935 $0 Not Implemented
UD0734 # 09 Y:2006 09 2006 REDUCE VENTILATION AIR $750 $0 Implemented
UD0734 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $477 $275 Implemented
UD0734 # 11 Y:2006 11 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $465 $53 Implemented
WV0333 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,819 $800 Implemented
WV0333 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $397 $210 Not Implemented
WV0333 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $0 Not Implemented
WV0333 # 01 Y:2006 01 2006 BURN WASTE OIL FOR HEAT $23,934 $19,500 Not Implemented
WV0333 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,663 $195 Implemented
WV0333 # 03 Y:2006 03 2006 DEVELOP A REPAIR/REPLACE POLICY $2,692 $544 Implemented
LE0226 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $154,145 $75,000 Implemented
LE0226 # 02 Y:2006 02 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $109,146 $363,000 Not Implemented
LE0226 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $81,919 $51,275 Implemented
LE0226 # 04 Y:2006 04 2006 IMPROVE COMBUSTION CONTROL CAPABILITY $64,647 $2,500 Not Implemented
LE0226 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $50,061 $47,500 Implemented