IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0482 # 10 Y:2001 10 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $64,110 $75,000 Not Implemented
IA0263 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,869 $1,014 Implemented
IA0263 # 02 Y:2001 02 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,475 $0 Implemented
IA0263 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $648 $125 Not Implemented
IA0263 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,382 $0 Not Implemented
IA0263 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $4,539 Not Implemented
IA0263 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $625 $0 Not Implemented
IA0263 # 07 Y:2001 07 2001 MODIFY CURRENT INCENTIVE PROGRAM $84,240 $0 Implemented
IA0263 # 08 Y:2001 08 2001 MODIFY CURRENT INCENTIVE PROGRAM $74,880 $0 Implemented
SD0274 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,500 $20,000 Implemented
SD0274 # 13 Y:2001 13 2001 PAY BILLS ON TIME TO AVOID LATE FEES $3,379 $0 Implemented
SD0274 # 14 Y:2001 14 2001 MODIFY STARTUP/SHUTDOWN TIMES $73,321 $0 Implemented
LE0106 # 01 Y:2001 01 2001 USE LESS WASTEFUL PACKAGING $1,700 $0 Not Implemented
LE0106 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $561 $640 Not Implemented
LE0106 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,150 $4,410 Implemented
LE0106 # 04 Y:2001 04 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $9,638 $0 Implemented
LE0106 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $961 $1,250 Implemented
LE0106 # 06 Y:2001 06 2001 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $6,293 $41,225 Not Implemented
GT0708 # 01 Y:2001 01 2001 MOVE BOILER TO MORE EFFICIENT LOCATION $7,140 $0 Implemented
GT0708 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,765 $0 Implemented
GT0708 # 03 Y:2001 03 2001 COMBINE UTILITY METERS $11,677 $1,000 Not Implemented
GT0708 # 04 Y:2001 04 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $38,843 $13,500 Implemented
GT0708 # 05 Y:2001 05 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $132,090 $60,000 Not Implemented
GT0708 # 06 Y:2001 06 2001 REPAIR OR REPLACE STEAM TRAPS $9,164 $10,500 Implemented
GT0708 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,650 $21,400 Implemented