IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0077 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $133 $125 Not Implemented
MI0077 # 08 Y:2004 08 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,368 $1,635 Not Implemented
UM0254 # 01 Y:2004 01 2004 ADOPT IN-HOUSE MATERIAL GENERATION $31,255 $30,000 Not Implemented
UM0254 # 02 Y:2004 02 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,650 $2,200 Implemented
UM0254 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,907 $0 Implemented
UM0254 # 04 Y:2004 04 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,584 $15,000 Not Implemented
UM0254 # 05 Y:2004 05 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,267 $10,000 Not Implemented
UM0254 # 06 Y:2004 06 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,010 $1,080 Implemented
UM0254 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,479 $1,038 Implemented
AM0463 # 01 Y:2004 01 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $23,300 $19,700 Implemented
AM0463 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $18,200 $16,600 Implemented
AM0463 # 03 Y:2004 03 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $14,500 $7,550 Not Implemented
AM0463 # 04 Y:2004 04 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,100 $0 Implemented
AM0463 # 05 Y:2004 05 2004 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,475 $0 Implemented
AM0463 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,470 $20 Not Implemented
AM0463 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,450 $730 Implemented
AM0463 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,030 $400 Implemented
IC0080 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,301 $900 Implemented
IC0080 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,280 $10,420 Implemented
IC0080 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,046 $0 Implemented
IC0080 # 04 Y:2004 04 2004 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $40,931 $95,360 Implemented
IC0080 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,354 $2,640 Implemented
IC0080 # 06 Y:2004 06 2004 USE OPTIMUM TEMPERATURE $24,757 $53,496 Not Implemented
IC0080 # 07 Y:2004 07 2004 USE OPTIMUM TEMPERATURE $62,610 $35,948 Implemented
IC0080 # 08 Y:2004 08 2004 INSTALL TIMERS AND/OR THERMOSTATS $377 $1,384 Not Implemented